BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 9, 2024 at 8:00 PM

Updated May 10, 2024

Site work for a water / sewer project in Tierra Del Mar, Oregon. Design plans call for site work for a water / sewer project.

Tillamook County near Tierra Del Mar, Oregon TEP seeks to contract with a consultant for completion of 2D hydrodynamic modeling, in-depth alternatives evaluation, and 30% preliminary design for the Sitka Sedge Tidal Wetland Project. The project will be carried out in partnership with the Oregon Parks and Recreation Department. TEP seeks a consultant with extensive experience in coastal wetlands restoration, hydrology, fish and wildlife habitats, and engineering to conduct the modeling, alternatives evaluation, and preliminary design. TEP anticipates this project will achieve the following primary objectives: (1) Maximize estuarine reconnection to tidal influence approximately 83 acres of estuarine habitat; (2) Remove the existing, non-functional tidegate structure; (3) Breach the existing dike to improve tidal connectivity, provide fish passage that meets ODFW guidelines, and improve water quality; (4) Maintain pedestrian, cycling, and equestrian recreational access; and (4) Evaluate storm-water inputs, hydrologic connectivity, and flooding impacts or benefits to neighboring properties and recommend protective measures if necessary.

Design

Water / Sewer

$200,000.00

Public - County

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
144
Active Projects
73
Bidding Soon
853
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 2, 2024

Project location map

To Be Determined, Tierra Del Mar, OR

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.