Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published June 6, 2022 at 8:00 PM
Updated September 14, 2023
Renovation of a mixed-use development in West Palm Beach, Florida. Completed plans call for the renovation of a medical facility.
Award Details Contract Award Date: Jun 01, 2022 Contract Award Number: 36C24822P1355 Task/Delivery Order Number: Contractor Awarded Unique Entity ID: NX6JJXA1M2M8 Contractor Awarded Name: JAMOA ENTERPRISE LLC Contractor Awarded Address: TAMARAC, FL 33321 FLK Base and All Options Value (Total Contract Value): $20090.00000000 The Fisher House is a lodging facility on the grounds of the VA Medical Center for families of our Veterans who are hospitalized. The home like atmosphere is to provide a tranquil retreat of respite for families while their loved one is hospitalized. The Fisher House's current 9 bathrooms need to have all lighting, shelves and mirrors replaced due to pitting and rust. Fisher House will supply needed lighting, shelves and mirrors and contractor will supply all other materials including paint. GENERAL DESCRIPTION a. Contractor will remove existing shelves, vanity lighting and mirrors. b. Contractor will install new 9 mirrors, 8 shelves and 18 vanity lights with those supplied. c. Contractor will paint the existing trim which includes the wainscotting trim and interior side of doors with a bright white in satin finish. d. Contractor will paint the existing walls using Benjamin Moore - Apparition 860 - Egg shell finish e. Contractor will paint the vanity in room 1 & 3. The vanity is 62" X 25". It will be painted with an epoxy paint. The color is Benjamin Moore - Rockport Gray HC-105. f. Contractor does not supply the new shelving, lights, or mirrors. g. Contractor will supply all other materials including paint, spackling, and any other materials to complete the job. h. Contractor is responsible for the clean-up during and after the project is complete. i. Contractor will patch all existing holes not utilized and caulk where necessary. NCO 8 anticipates the award of a firm-fixed-price contract to provide Bid Build services. The magnitude of construction is between $ 25,000 and $100,000 The solicitation will be issued on or about April 27, 2022. All information for this solicitation will be posted at www.sam.gov. All interested firms must be registered in the System for Award Management www.sam.gov and VetBiz www.vip.vetbiz.gov. This is a 100% Service-Disabled Veteran Owned Small Business (SDVOSB) set-aside. The method of contractor selection has not been determined at this time. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Award
Medical
$20,090.00
Public - Federal
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 12, 2022
June 13, 2022
7305 N Military Trl, West Palm Beach, FL
Related To This Project
West Palm Beach, FL
Bid Date: May 19 2022
West Palm Beach, FL
--
West Palm Beach, FL
--
West Palm Beach, FL
Bid Date: Mar 29 2022
West Palm Beach, FL
Bid Date: Oct 11 2021
West Palm Beach, FL
Bid Date: Aug 02 2021
West Palm Beach, FL
Bid Date: Apr 12 2021
West Palm Beach, FL
Bid Date: Dec 07 2020
West Palm Beach, FL
--
West Palm Beach, FL
Bid Date: Aug 05 2020
West Palm Beach, FL
Bid Date: May 04 2022
West Palm Beach, FL
Bid Date: Mar 10 2022
West Palm Beach, FL
--
West Palm Beach, FL
--
West Palm Beach, FL
Bid Date: Mar 10 2022
See the Projects and Companies Shaping 2026 Before Anyone Else
Start the New Year with a clearer view of the construction market. Unlock early access to commercial project data that keeps your pipeline full and your competitors behind. Sign up today for the project and contact data that others won't discover until its too late.
