BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Cary, Illinois. Working plans call for site work for a water / sewer project.

**As of June 21, 2022, bids were rejected as for only one bid that was considerable over the approved budget. No definite date for the rebid. All Work, materials, and equipment are to be in accordance with the Contract Documents on file at Village Hall by this reference made a part hereof as though fully set out and incorporated herein. The Work for the said improvement, as required by the Contract Documents, is generally described as follows: The project includes furnishing all labor, materials, and equipment necessary for the installation, testing, and startup of a mechanical fine screen, fiberglass structure, site work and all necessary components to complete the project as shown in the contract documents. The Village of Cary, Illinois, in accordance with Title VI of the Civil Rights Act of 1964, 78 Stat. 252, 42U.S.C. 2000d to 2000d-4 and Title 49, Code of Federal Regulations, Department of Transportation, Subtitle A, Office of the Secretary, Part 21, Nondiscrimination in Federally- assisted programs of the Department of Transportation issued pursuant to such Act, hereby notifies all bidders that it will affirmatively ensure that in any contract entered into pursuant to this advertisement, minority business enterprises will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color or national origin in consideration for an award. Work under the proposed Contract Documents shall be commenced upon written Notice to Proceed to be issued on or before 90 calendar days from bid opening and shall substantially complete 270 calendar days after Notice to Proceed and be completed and ready for operation 30 calendar days after substantial completion, subject to any extension of time, which may be granted by the OWNER. Each Bid shall be made on the Bid Form prepared for this purpose, which may be obtained from the OWNER. Any alteration in the official Bid Form will entitle the OWNER, at its option, to reject the Bid from consideration. Each Bid shall be accompanied by a Bid Bond or a certified cashier's check, drawn on a solvent state or national bank, or a certified share draft drawn on a credit union in Illinois or chartered under the laws of the United States, and submitted in a sealed envelope containing the Bid. The Bid Bond shall be substantially in the form set forth in the Contract Documents. The Contractor's certified check or Bid Bond shall be in an amount equal to Five (5) percent of the amount of the Bid, made payable to the OWNER. The check may be cashed for the full amount by the OWNER or the Bid Bond forfeited in the full amount to the OWNER as liquidated damages in the event the successful Bidder fails to enter into contract and file acceptable bonds satisfactory to the OWNER assuring the faithful fulfillment of the contract and maintenance of said improvements as required by law within Fifteen (15) days after the acceptance of the Bid. The OWNER reserves the right to reject any or all Bids, to re-advertise for Bids or to defer action on the Bids received for a period not to exceed Ninety (90) days from and after the date and time specified in this Notice of Letting for receiving said Bids, and to waive irregularities and informalities. The successful Bidder will be required to furnish a Performance and Maintenance Bond and a Payment Bond, each in an amount equal to One Hundred (100) percent of the contract price. Said bonds to be issued by a responsible Surety approved by the OWNER and shall guarantee that the Principal shall promptly make payment to all persons, firms, subcontractors, and corporations furnishing materials for or performing labor in the performance of the Work stated and the faithful performance of the contract and the terms and conditions therein contained and the guarantee and maintenance of said facilities in good repair and working conditions for not less than One (1) year from the time of acceptance of such improvements by the OWNER.

Final Planning

Water / Sewer

$400,000.00

Public - City

Site Work

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
190
Active Projects
102
Bidding Soon
2,121
All Active Projects
908
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 27, 2022

July 20, 2022

img_map_placeholder

Multiple Locations, Cary, IL

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.