BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and asbestos abatement for a mixed-use development in Chesterton, Indiana. Completed plans call for site work for a educational facility; and for asbestos abatement for a educational facility.

All work for the Environmental Abatement project may be under one or more contracts with the Owner based on bids received. The Consulting Engineer will manage the work. All work shall be in full accordance with the Bidding Documents which are on file with the Owner and may be examined by prospective bidders at the following locations: Office of the Consulting Engineer Amereco Engineering 54 Michigan Street alparaiso, IN 46383 Bid security in the amount of ten percent (10%) of the Bid must accompany each Bid in accordance with the Instructions to Bidders. The successful Bidders will be required to furnish Performance and Payment Bonds for one hundred percent (100%) of their Contract amount prior to execution of Contracts. Contractors submitting bids for the performance of any Work as specified in this project should make such Bids to Duneland School Corporation. Contractors are advised that the Contract as finally entered into with any successful Bidder may be entered into with either the School Corporation or the Building Corporation or certain portions of the Contract may be entered into by both the School Corporation and the Building Corporation. The Owner reserves the right to accept or reject any Bid (or combination of Bids) and to waive any irregularities in bidding. All Bids may be held for a period not to exceed 60 days before awarding contracts. Locations- Liberty Elementary School 50-1 W. 900 N. Chesterton, IN 46304 Liberty Intermediate School 50 W. 900 N. Chesterton, IN 46304 Liberty Elementary School: - Selective demolition - Sinks with sound insulation coating - Pipe insulations - Floor tile and associated mastic - Carpet removal, where required, to access floor tiles and/ or associated mastic - Chalkboards and associated mastic - Built-up roofing for MEP penetrations Liberty Intermediate School: - Selective demolition - Lab countertops - Beaker drying racks - Transite fume hoods - Floor tile and associated mastic - Carpet removal, where required, to access floor tiles and/or associated mastic - Pipe insulations - Chalkboards and associated mastic - Sinks with sound insulation coating - Built-up roofing for MEP penetrations

Post-Bid

Educational

Public - County

Asbestos Abatement, Site Work

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
185
Active Projects
123
Bidding Soon
1,751
All Active Projects
786
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 26, 2022

June 27, 2022

img_map_placeholder

Multiple Locations, Chesterton, IN


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.