BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a municipal facility in Cut Bank, Montana. Completed plans call for the renovation of a municipal facility.

Glacier County Board of Commissioners will receive sealed bids for the purchase and installation of three (3) existing commercial boilers and pumps. Boilers to be equal to or greater than existing boilers: - Existing Brand - WEIL-McLAIN - Boiler Model - Ultra 310 - Type of Gas - Natural - Maximum Input - 310,000 Btu/hr (90,9 kW) - Minimum Input - 62,000 Btu/hr (18,2 kW) - CSA Gross Output - 289,000 Btu/hr (84,8 kW) All bids shall remain effective for a period of thirty (30) days from the date of opening. Glacier County reserves the right to consider or reject any and all bids, and further to waive any defects or irregularities. A contract will be awarded to the most responsible bidder All bidders are expected to be aware of and to abide by all state and federal statutes, rules, and regulations governing the solicitation and acceptance of public contracts, including any such statute, rule or regulation relating to non-discrimination. The Board of Commissioners reserves the right to reject any or all bids, to waive irregularities, or to accept any bid they deem to be in the best interest of Glacier County.

Post-Bid

Municipal

$200,000.00

Public - County

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
6
Active Projects
4
Bidding Soon
46
All Active Projects
19
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 25, 2022

May 25, 2022

img_map_placeholder

To Be Determined, Cut Bank, MT

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.