BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 12, 2022 at 8:00 PM

Updated September 14, 2023

Site work and paving for a civil project in Canwood, Saskatchewan. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

Removal and disposal of the existing bridge and installation of two 3 000 mm diameter by 20.0 m length corrugated steel pipe culverts through the grid road no. 694 approximately 9.24 km south of its junction with highway no. 55; for a total length of 40 m. There will not be a public tender opening. Bidders will receive an email from the Rural Municipality upon award of the Contract with the tender results. Documents are available at www.sasktenders.ca The Specified Substantial Completion Date is September 30th, 2022. 3.1.2 The Specified Final Completion Date is October 28, 2022.

Post-Bid

Bridges / Tunnels

$400,000.00

Public - County

Paving, Site Work

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
11
Active Projects
5
Bidding Soon
48
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 24, 2022

June 23, 2022

Project location map

Multiple Locations, Canwood, SK

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.