Site work and paving for a mixed-use development in Snohomish, Washington. Completed plans call for site work for a road / highway; for paving for a road / highway; power facility; and water / sewer project.

Project Description: the City of Snohomish Is Seeking a Contractor to Furnish All Labor, Materials, and Equipment Necessary to Complete the Holly Vista Drive Improvements Project in Snohomish, Wa The Work to Be Performed Under This Contract Provides for Construction of New Storm Drain Conveyance and Detention Structures and Pipes on Holly Vista Drive, 16th Street, and Suncrest Drive, as Well as Repair of Existing Sanitary Sewer Pipes and Service Stubs Including Minor Trenchless Repairs as Shown on the Project Plans and Specified in These Technical Provisions for the City of Snohomish, Snohomish County, Washington. Also Included With This Work Is Restoration of All Disturbed Roadway Features and Existing Utilities Which Includes Asphalt Roadway Paving, Asphalt Patching or Resurfacing of Driveways, Replacement of Curbs and Sidewalks, as Well as Potholing and Repair of Crossing Utility Conflicts. All Bid Proposals Shall Be Accompanied by a Bid Proposal Deposit in Cash, Certified Check, Cashier's Check, or Surety Bond in an Amount Equal to Five Percent (5%) of the Grand Total Amount of Such Bid Proposal. No Bid Shall Be Considered Unless Accompanied by Such Bid Proposal Deposit. If the Successful Bidder Does Not Enter Into a Contract and File a Performance and Payment Bond and the Required Insurance Certificates, With the City of Snohomish Within Ten (10) Working Days After Notice of Award of Bid, the Amount of the Bid Deposit Shall Be Forfeited to the City of Snohomish. Unsuccessful Bidders' Deposits Will Be Returned Upon City's Execution of Contract Documents or Rejection of All Bids. A One Hundred Percent (100%) Contractor's Performance and Payment Bond Is Required. The Bond Must Be Delivered to the Snohomish City Clerk Within Ten (10) Working Days After Notification of the Award to the Successful Bidder. The Bond Must Be Approved by City Officials Before the Contract Award Is Final. A Contract Is Required and Must Be Executed and Returned to the City of Snohomish Within Ten (10) Working Days After Notification of Award. Approval of the Contract by City Officials Is Required Before the Contract Award Is Final. A Certificate of Liability Insurance Reflecting the Required Public Works Contract Insurance Limits for This Project Must Be Furnished to the City of Snohomish Within Ten (10) Working Days After Notice of Award of Bid. This Insurance Certificate Shall Also Specifically Name the City of Snohomish as an Additional Insured. The Successful Bidder May Not Commence Work Under This Contract Until All Required Insurance Coverage Has Been Approved by the City. The City of Snohomish Reserves the Right to Reject Any or All Bids, and to Waive Irregularities or Informalities in the Bid or in the Opening. The City of Snohomish Reserves the Right to Delete Portions of the Work. No Bidder May Withdraw His Bid After the Hour Set for the Opening Thereof, or Before Award of Contract, Unless Said Award Is Delayed for a Period Exceeding Sixty (60) Calendar Days. The Bidder Further Agrees to Begin Work Within Ten (10) Working Days After Notice to Proceed Has Been Issued by the City of Snohomish. The Contractor Has One-hundred and Twenty (120) Working Days to Complete the Construction of the Project. Payment of Liquidated Damages Will Be Made by the Contractor to the City in the Amount Specified in the Contract if the Construction Work Is Not Physically Completed Within the Allotted Working Days, in Accordance With Section 1-08.9 of the Standard Specifications. Bid Package and Technical Related Questions Can Be Directed to the City Engineer, Yoshihiro Monzaki, P.e., at (360) 282-3161 Project Title:city of Snohomish Holly Vista Drive Improvements Project Engineer's Estimate: $950,000 - $1,200,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Roads / Highways

$860,947.00

Public - City

Paving, Site Work

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
89
Active Projects
49
Bidding Soon
922
All Active Projects
342
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 3, 2022

July 4, 2022

img_map_placeholder

Holly Vista Dr, Snohomish, WA


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.