BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a mixed-use development in Columbia, Missouri. Completed plans call for the renovation of a educational facility.

QA 12:00 p.m., Friday, May 6, 2022. 1. Vendor shall have one contact person that will be available for the entire project and will meet regularly with CPS Technology Services project manager with updates. 2. Vendor shall remove existing projectors, poles, smartboards, and interactive panels. 3. Vendor will reroute HDMI cables if needed at time of removal or installation of product. 4. Additional required cables will be provided by the District. 5. When removing projectors, smartboards or interactive panels that are marked with an orange sticker this indicates the device will be retained by CPS. Equipment retained by CPS will be stored in a designated area in the respective building. All equipment not marked with an orange sticker must be removed from the premises by the vendor the day the equipment is removed from the classrooms. It's the vendor's responsibility to remove, store, transport, and properly dispose and/or recycle the old equipment. 6. Vendor shall use existing mounts when feasible for either projectors, smartboards, or interactive boards. 7. All removal and installation work must be done after school hours and cleaned up before the start of the next school day. Work will be done in the evenings, weekends and holidays. (school hours will be provided by the project manager, see list of buildings below). 8. Any room that has old equipment removed must have the new equipment installed the same day. 9. Equipment in each classroom must be connected, tested and functional for the next day's classes. The District reserves the right to charge the awarded vendor $100.00 per day for any classroom left inoperable. 10. Successful bidder must store, transport, and deliver equipment to buildings as installation begins. Equipment not yet installed will not be stored on CPS property. 11. Refurbished or repaired parts/equipment will not be accepted. 12. Advanced training "train the trainer model" - with a more in-depth explanation of the use of the equipment for instruction. For both the Smartboards and Cleartouch boards. 13. All unused mounting brackets and cables will be returned to CPS Technology Services project manager upon completion of the audio visual project. 14. Invoicing shall be submitted by building, once each entire location is complete.

Award

Educational

$2,699,875.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
43
Active Projects
25
Bidding Soon
335
All Active Projects
131
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 12, 2022

September 1, 2022

img_map_placeholder

Multiple Locations, Columbia, MO

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.