BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for an educational facility in Rolla, Missouri. Completed plans call for site work for a educational facility.

Fiber Relocation The contractor shall have a diversity participation goal of 10% minority business enterprise, women business enterprise, disadvantaged business enterprise, veteran owned business, 3%. Questions regarding the scope of work and commercial conditions should be directed to pat litty at 5733414865 or littyp@mst.edu. The owner reserve the righ to waive informalities in bids and reject any and all bids. The Contractor shall have a Diversity Participation goal of ten percent (10%) combined Minority Business Enterprise (MBE), Women Business Enterprise (WBE), Disadvantaged Business Enterprise (DBE), and/or Veteran Supplier Diversity, with Service Disabled Veteran Owned Business (SDVE) of three percent (3%) of awarded contract price for work to be performed.Project consists of the installation of new duct bank sections and installation of fiber optic cabling. Fiber optic cabling is to be provided by the Owner, installed by the Contractor. Cabling will route through both new and existing duct banks on campus. All splices in manholes/handholes are to be provided by Contractor. All terminations inside data rooms are to be provided by Owner.Demolition shall consist of pull back of (3) existing fiber optic cables from the west end of the power plant tunnel to the east end of the tunnel.Electrical work shall consist of the pull back of existing fiber optic cables in the existing utility tunnel at the power plant, installation of new duct bank on campus as indicated on the drawings, and the installation of the OFCI fiber optic cabling. Contractor is to provide splices in the large vault at Havener. Owner will perform fiber terminations in all data closets.Work shall be performed under this Contract on the campus of Missouri University of Science & Technology, in and about Bertelsmeyer Hall, Castleman Hall, Campus Support, Power Plant, Havener, Toomey Hall and Harris Hall.

Award

Educational

$187,494.00

Public - State/Provincial

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
50
Active Projects
28
Bidding Soon
565
All Active Projects
212
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 27, 2022

May 27, 2022

img_map_placeholder

To Be Determined, Rolla, MO

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.