EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 14, 2022 at 8:00 PM

Updated October 1, 2024

Site work for a water / sewer project in Champaign, Illinois. Completed plans call for site work for a water / sewer project.

As of June 14, 2022 This project is awarded to SNC Construction, INC. with awarded amount of $601,747.42. Planned Work: Includes the installation and rehabilitation of drainage and sewerinfrastructure, including repairs of pipes, manholes, inlets, underdrains, pavement removal and replacement, ditch grading, backfilling, and other related work required to complete the project.Part 2 -Unplanned/Emergency Work: Includes installation, repair, and rehabilitation of various sewer and drainage infrastructure, including installation and repair of manholes and inlets, installation and repair of pipes, ditch grading, channel erosion repair, backfilling, removal and installation of pavement surfaces and other related work required to complete repairs. Unplanned/Emergency work will be utilized on an as-needed basis when rehabilitation or repairs are required and may occur at anytime during the project time frame. Unplanned/Emergency repairs will be performed on a time and material basis. (1) A utilization goal of10% MBE (Minority Business Enterprise) and 5% WBE (Woman Business Enterprise). Utilization goals refer to the percentage of work performed by MBEor WBEsubcontractors on the project.(2) A workforce participation goal of20% MBE and 15% WBE. Workforce participation goals refer to the percentage of minority and female individuals employed on a project. Bidders will be required to show that they have met one or both of the above diversity goalsor that they have made, or commit to making, good faith efforts to reach those goals. Sufficiency of good faith efforts may vary depending on the type of contract, thetype of products and/or services to be provided, and the duration of the contract.For additional information, see Sections 2.18 and 4.7 of the bid documents, or contact Rachel Joy, Community Relations Manager and Compliance Officer, at rachel.joy@champaignil.gov. The City of Champaign, Illinois, reserves the right to reject any or all bidsor portions thereof and to waive any formality or technicality in any bids in the interest of the City. The criteria for selection of the lowest responsible bidder are set forth in Section 12.5-38 of the Champaign Municipal Code, 1985, as amended and the bid documents.To the extent required bylaw, the contractor shall complywith the Illinois Prevailing Wage Act, the Veteran's Preference Act, the Employment of Illinois Workers on Public Works Act, the City's Equal Opportunity in Purchasing Ordinanceandthe Illinois Human Rights Act.If federal funds are used to finance thisproject, the contractor shall complywith the Davis-Bacon Act.

Award

Water / Sewer

$601,745.00

Public - City

Site Work

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry
Division 12 - Furnishings

Division 12 - Furnishings

Furniture, Residential Furniture, Beds
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Fill, Backfill
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Watering, Bases, Ballasts, and Paving, Curbs and Gutters, Site Improvements, Fences and Gates, Planting, Planting Preparation, Mulching, Turf and Grasses, Seeding
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Cranes and Hoists, Lifting Devices, Clamps
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
94
Active Projects
60
Bidding Soon
553
All Active Projects
270
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 28, 2022

May 27, 2022

img_map_placeholder

Multiple Locations, Champaign, IL

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

2022 Sewer Rehabilitation Project

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.