BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work and new construction of a mixed-use development in Ballston Lake, New York. Completed plans call for the demolition of a educational facility; for the construction of a educational facility; and for site work for a educational facility.

Reconstruction Work at Multiple School District Buildings Contract 5: Exterior Painting - The Work includes Parking lot reconstruction, interior and exterior slab replacement, door hardware and access control, site lighting, flooring replacement, asbestos abatement, classroom renovations.. Any bid received after the time and date stated above will be returned to the bidder unopened. Each Bidder shall prepare their bid proposal, along with a bid security, in accordance with the terms and subject to the conditions set forth in the "Information for Bidders". Attention of bidders is particularly called to the requirements as to conditions of employment to be observed and the minimum wage rates to be paid under the contracts. No bidder may withdraw his bid within 45 days after the date of the actual bid opening. The Board of Education reserves the right to reject any or all bids and to waive any informalities or defects in such bid either before or after the bid opening. The Board of Education reserves the right to reject any or all bids and to waive any informalities or defects in such bid either before or after the bid opening. BURNT HILLS SENIOR HIGH SCHOOL: 52-01-01-06-0-003-038 CHARLTON HEIGHTS ELEMENTARY SCHOOL: 52-01-01-06-0-008-020 PASHLEY ELEMENTARY SCHOOL: 52-01-01-06-0-006-026 STEVENS ELEMENTARY SCHOOL: 52-01-01-06-0-004-027 Project Locations: a. Burnt Hills Senior High School: 88 Lakehill Road, Burnt Hills, NY 12027 b. Charton Heights Elementary: 170 Stage Road Ballston Lake NY 12019 c. Pashley Elementary School: 30 Pashley Road, Glenville, NY 12302 d. Stevens Elementary School: 25 Lakehill Road, Ballston Lake, NY 12019 Work on site shall not be started until June 27, 2022 Completion- 11/30/2022

Award

Educational

$507,490.00

Public - County

Demolition, New Construction, Site Work

75

29

4

5

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
143
Active Projects
79
Bidding Soon
1,094
All Active Projects
493
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 6, 2022

June 27, 2022

img_map_placeholder

Multiple Locations, Ballston Lake, NY

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.