BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 26, 2022 at 8:00 PM

Updated August 21, 2024

Site work for a playground / park / athletic field in North Waltham, Massachusetts. Completed plans call for site work for a playground / park / athletic field.

pecific Scope of Work A. Install an impermeable polyurethane synthetic track system comprised of a base layer of polyurethane bound SBR rubber granules, BEYPUR 200, an impermeable layer (seal coat) of a two-component urethane, and topped with BEYPUR, a spray-applied coating of single-component polyurethane, and EPDM granules. B. Layout and paint all track lines and event markings as required and specified by current IAAF and NCAA rules.

Bid Results

Playgrounds / Parks / Athletic Fields

$11,319,000.00

Public - City

Site Work

40

27

8

4

Subscribe For Documents

97 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
634
Active Projects
321
Bidding Soon
4,478
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 24, 2022

July 22, 2022

Project location map

19 Athletic Field Rd, North Waltham, MA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.