BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Deadwood, South Dakota. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; water / sewer project; and water / sewer project.

https://www.bhpioneer.com/local_news/282-2k-sampson-avenue-area-mill-and-overlay-project-approved-in-deadwood/article_def698c2-cd86-11ec-a855-430c20b7be7a.html The sole bid received was the winner, the project estimate growing by $70,000 from just a year ago, as the Deadwood City Commission awarded the Sampson Avenue Area Mill and Overlay project to Simon Construction for $282,218 Monday. The work consists of crack sealing and asphaltic seal coating, installation of curb and gutter, sidewalk and asphalt paving, asphalt milling, and adjusting water valves and manholes, with a project completion date of Sept. 23. "We had three contractors had bids pulled. We got one bid back," said Deadwood Public Works Director Bob Nelson, Jr. "The engineer's estimate was $219,000 and that was a bid that was estimated, given the times that we're in. Originally, a year ago, it was bid at, estimate was $150,000 on it. To give you an idea where we're at. I don't think if we put it out there, it's gonna get cheaper ... it's Railroad, Sampson, Spring Street. We will get a large quantity of asphalt millings out of it that we get." Deadwood City Commissioner Gary Todd asked if Spring Street will be extended at all. "Just enough to drain that driveway from Gustafson's, yes, where we put that wall in," Nelson said. Nelson hopes to begin this project in June. ________________________________________________________________ SAMPSON AVENUE AREA MILL AND OVERLAY PROJECT CITY OF DEADWOOD, SD The work generally consists of crack sealing and asphaltic seal coating, installation of curb and gutter, sidewalk and asphalt paving, milling of asphalt, and adjusting water valves and manholes. Project completion shall be September 23, 2022 A performance bond is also required. Bids must be sealed and marked Sampson Avenue Area Mill and Overlay Project. Bids shall be mailed or hand delivered to the Deadwood Finance Office, 102 Sherman Street, Deadwood, South Dakota, 57732. The City of Deadwood has the right to reject any and all bids.

Award

Roads / Highways

$200,000.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
10
Active Projects
5
Bidding Soon
66
All Active Projects
25
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 2, 2022

June 1, 2022

img_map_placeholder

Sampson St, Deadwood, SD


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.