Renovation of a mixed-use development in Homestead, Pennsylvania. Completed plans call for the renovation of a educational facility.

Emergency Generator Replacement for the Allegheny Intermediate Unit #3 It is the intent of the Owner to enter into a single contract for the work. Bids shall include a Bid Security Bond or Certified Check, payable to Allegheny Intermediate Unit #3, in an amount of five percent (5%) of the bid, in accordance with Instructions to Bidders, as included in the Contract Documents. Bids shall include a Bid Security Bond or Certified Check, payable to Allegheny Intermediate Unit #3, in an amount of five percent (5%) of the bid, in accordance with Instructions to Bidders, as included in the Contract Documents. The Owner reserves the right to reject any and all bids when such rejection is in the interest of the Owner, and to reject the bid of any Bidder, who in the Owner's judgment, is not in position to perform the Contract.

Award

Educational

$219,690.00

Public - City

Renovation

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Substitution Procedures, Contract Modification Procedures, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Closeout Submittals, Warranties
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Facility Remediation, Transportation and Disposal of Hazardous Materials
Division 08 - Openings

Division 08 - Openings

Specialty Doors and Frames, Access Doors and Panels, Folding Doors and Grilles
Division 11 - Equipment

Division 11 - Equipment

Commercial Equipment, Office Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories, Rugs and Mats, Runners, Furniture
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, Hangers and Supports for Plumbing Piping and Equipment
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Hangers and Supports for HVAC Piping and Equipment, Instrumentation and Control for HVAC, Sequence of Operations for HVAC Controls, HVAC Piping and Pumps, Steam and Condensate Piping and Pumps, Steam and Condensate Heating Piping, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Outlets and Inlets
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Low-Voltage Electrical Power Conductors and Cables, Grounding and Bonding for Electrical Systems, Hangers and Supports for Electrical Systems, Raceway and Boxes for Electrical Systems, Identification for Electrical Systems, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Low-Voltage Switchgear, Switchboards and Panelboards, Switchboards, Panelboards, Low-Voltage Distribution Equipment, Wiring Devices, Low-Voltage Circuit Protective Devices, Fuses, Enclosed Switches and Circuit Breakers, Facility Electrical Power Generating and Storing Equipment, Packaged Generator Assemblies, Lighting, Emergency Lighting
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Excavation and Fill, Fill
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Site Improvements, Screening Devices
Division 33 - Utilities

Division 33 - Utilities

Communications Utilities, Communications Distribution
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Cranes and Hoists

Find More Local Projects

Within 75 Miles of This Project
96
Active Projects
66
Bidding Soon
953
All Active Projects
415
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 18, 2022

July 24, 2023

img_map_placeholder

475 E Waterfront Dr, Homestead, PA


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Emergency Generator Replacement for the Allegheny Intermediate Unit #3

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.