BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 7, 2022 at 8:00 PM

Updated September 14, 2023

Site work for a bridge / tunnel in Brodheadsville, Pennsylvania. Completed plans call for site work for a bridge / tunnel.

The project consists of the removal of (2) 36-inch diameter double-barreled corrugated metal pipe culverts located along Bush Lane and Scott Street in Chestnuthill Township as well as the removal of (3) 36-inch double barreled corrugated metal driveway culverts. Each of the existing double barrel culverts will be replaced with a 3.5-ft by 7-ft precast concrete box culvert. The project includes all associated E&S measures, excavation, grading and traffic control and pavement restoration. CLARIFICATION DEADLINE 5/23/2022 12:00 AM Discussion and possible award will be on June 7th, 2022 at 7:00 PM local time at the Chestnuthill Township Municipal Building, 271 PA-715, Brodheadsville, PA 18322.

Bid Results

Bridges / Tunnels

$564,748.00

Public - City

Site Work

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
772
Active Projects
282
Bidding Soon
5,775
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 27, 2022

June 27, 2022

Project location map

Bush Ln & Scott St, Brodheadsville, PA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.