BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 16, 2022 at 8:00 PM

Updated January 26, 2024

Site work for a mixed-use development in Santa Clara, California. Completed plans call for site work for a transportation facility.

Only pre-qualified contractors are eligible to bid. The Project will consist of furnishing all labor, materials, tools, equipment, services, supervision, and incidentals necessary to perform rail rehabilitation and replacement at various locations along the VTA light rail system. The scope also includes the installation of new crossovers; associated signaling, communications, overhead contact system, traction power items, ballast/spot tie replacement, and upgrading switches from manual to powered. The Project will also require: Bidder must demonstrate experience in each of the following: (1) special trackwork; (2) overhead contact system; and (3) railroad signaling and be able to apply the best available practices. The minimum experience consists of: 1. Bidder must have completed at least three (3) construction contracts within the last ten (10) years for which Bidder was the prime or direct contractor for the work. 2. Each such completed construction contract must have had a minimum original value of at least $5,000,000. 3. Each such completed construction contract must have had an original contract duration of at least 270 calendar days. 4. Bidders proposed contracting team must have obtained experience in each of (1) special trackwork; (2) overhead contact system; and (3) railroad signaling in the past 10 years through a contract or contracts meeting the requirements of paragraphs 2 and 3 above. The estimated cost of construction for the Project is in the range of $20 million to $27 million, including both the base and bid option scope. The work will include furnishing all labor, supervision, materials, and equipment necessary to construct the Project. Question Submission Deadline:May 13, 2022, 2:00pm *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The estimated time for construction of the Project is 820 calendar days.

Post-Bid

Transportation Terminals

$27,000,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

17

Subscribe For Documents

30 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
312
Active Projects
118
Bidding Soon
2,627
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 13, 2022

October 27, 2022

Project location map

To Be Determined, Santa Clara, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.