BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Riverside, California. Contact the soliciting agency for additional information.

Per the owner, as of January 8, 2024, this solicitation has been awarded and the standards have been completed. Closed solicitation has been included below for reference. .......... Western Municipal Water District (Western) is requesting proposals from a qualified consulting and engineering firm, to develop SCADA standards and requirements based on industry standards, best practices, and the existing informal standards and preferences of Western. Western's SCADA Standards document will be a "living" document and will include HMI, PLC, and operational technology (network and computer system hardware/software) standards, SCADA management and maintenance procedures, and SCADA design requirements. The standards will allow Western to facilitate capital improvement project requirements and upgrade projects with efficient and consistent SCADA development. In 2018, Western completed a SCADA Master Plan. The SCADA Master Plan includes an Implementation Plan focused on a SCADA strategic plan that identifies SCADA component upgrades and system improvements for a cohesive, standardized, and optimized control system and to improve the overall SCADA system Reliability, Accessibility, Maintainability and Security (RAMS). The SCADA standards development is listed in phase one of the implementation plan. Western has the distinction of being both a wholesale and retail water provider. The wholesale division provides water and leadership to thirteen wholesale customers in a 527-square mile area of Riverside County. Nine of the wholesale customers receive imported water from Metropolitan Water District, as well as local water from the Arlington and Chino Desalters. The retail division provides water to businesses, industrial users, and more than 95,000 residents in three retail areas. Western's potable and recycled water system includes 128 pumps, 621 miles of pipeline ranging from 4 to 60 inches, and 38 water storage reservoirs. Western's wastewater system includes approximately 8,000 service connections, 24 lift stations and two wastewater treatment plants. This project will provide additional reliability to Western's operation and supports a proactive solution to maximize reliability. This scope covers the development of the highest priority sections of the Standards. The project may at the District's discretion, consist of additional phases which will be incorporated through future amendments to the agreement. Standards developed through this project include: SCADA HMI Standards SCADA PLC Standards SCADA Alarm Management Standards SCADA Historical Data and Reporting Standards SCADA Design Standards Operational Technology Standards Communications Standards Data Management Standards System Testing Standards Documentation Standards SCADA Project Delivery Online Q&A - Yes Q&A Deadline - 04/18/2022 5:00 PM (PDT) Project Schedule - This project shall be completed, and all final deliverables made, within 240 calendar days. This RFP does not commit Western to award a contract or pay any costs associated with the preparation of a proposal. Western reserves the right to reject any or all proposals and reserves the right to accept the proposal that is the most advantageous to Western regardless of proposal content. The method of contractor selection has not been determined at this time.

Award

Municipal

$300,000.00

Public - County

Service, Maintenance and Supply

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

4

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
210
Active Projects
91
Bidding Soon
2,229
All Active Projects
999
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 2, 2023

img_map_placeholder

To Be Determined, Riverside, CA


Try it free. The data you need to build the relationships you want.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.