Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 22, 2022 at 8:00 PM

Updated January 26, 2024

Site work and paving for a mixed-use development in Perks Corner, California. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

**As of June 3, 2022, this project has not yet been awarded. A timeline for award has not yet been established.** The Project is located along Missouri Flat Road, in Diamond Springs in the County of El Dorado. The Work to be done is shown on the Plans, and generally consists of, but is not limited to: A. Construction of 188 linear feet of Class I bike path including grading and paving, concrete retaining wall, curb, gutter, and sidewalk, striping, and rock ditch improvements. Other items or details not mentioned above, that are required by the plans, Standard Plans, Standard Specifications, or these Special Provisions must be performed, constructed or installed. B. Bids are required for the entire Work described herein. C. The Contract time is TWENTY (20) WORKING DAYS. D. For bonding purposes the anticipated Project cost is less than $300,000. Bidders must be properly licensed to perform the Work pursuant to the Contractors State License Law (Business and Professions Code Section 7000 et seq.) and must possess a CLASS A license or equivalent combination of Classes required by the categories and type of Work included in the Contract Documents and Plans at the time the Contract is awarded, and must maintain a valid license through completion and acceptance of the Work, including the guarantee and acceptance period. Failure of the successful Bidder to obtain proper adequate licensing will constitute a failure to execute the Contract and will result in the forfeiture of the Bidders security. Bids will be considered for award by the Board of Supervisors. The County of El Dorado reserves the right after opening bids to reject any or all bids, to waive any irregularity in a bid, or to make award to the lowest responsive, responsible Bidder and reject all other bids, as it may best serve the interests of the County. As a condition of award, the successful Bidder will be required to submit bonds and evidence of insurance prior to execution of the Agreement by the County. Failure to meet this requirement constitutes abandonment of the Bid by the Bidder and forfeiture of the Bidders security. Award will then be made to the next lowest, responsive, responsible Bidder. The Office Engineer must receive all required documents within ten (10) business days of the date of the Notice of Award of Contract letter.

Award

Roads / Highways

$267,131.00

Public - County

Paving, Site Work

11

7

2

8

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
334
Active Projects
131
Bidding Soon
2,104
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 13, 2022

June 13, 2022

Project location map

Missouri Flat Rd, Perks Corner, CA

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed