BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 3, 2022 at 8:00 PM

Updated June 7, 2025

Site work and paving for a mixed-use development in Salisbury, Maryland. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; playground / park / athletic field; and playground / park / athletic field.

For City Park Bandstand and Bridge Repairs -- The purpose of this project is to improve the historic bridge and bandstand located in the Salisbury City Park in Salisbury, Maryland. Such improvements include paint application, water blasting, and replacing structural components. Pictures containing a sampling of the actual conditions of both the pedestrian bridge and bandstand are attached. The accuracy of measurements must be verified by the contractor. A. Work shall be completed within 150 days of Notice to Proceed. SCOPE OF WORK: A. Pedestrian Bridge: Removal/ Replace 1. Remove and replace two hundred sixty-four (264) feet of the top rail, including angle approaches and 2x4 supports in kind. 2. Remove and replace nine full width 6" x 6" posts, as specified in attachment. 3. Remove and replace all 64 deteriorated wood spaces between the deck and handrail. Toe kick cable may be removed and re-installed for ease. Materials must be in kind with regards to material, size, and shape. 4. Remove and replace all interior picket/cross members. Materials must be in kind with regards to material, size, and shape. 5. Replace or level decking boards, as necessary, to eliminate trip hazards. B. Pedestrian Bridge: Preparation 1. IPE wood decking boards to be power washed. 2. All existing wood and metal that is currently painted white is to be power washed, scraped, sanded, patched and caulked 3. All carvings of initials, etc. are to be filled, sanded, etc. C. Pedestrian Bridge: Painting 1. All paint and surface prep specs should adhere to the attached paint specification sheets. 2. New wood to be primed and painted with two coats of industrial exterior paint to match existing finish. 3. Existing wood and metal to be painting with two coats of industrial exterior paint to match existing finish. D. Pedestrian Bridge: General 1. No potable water is available at the location, therefore, the successful vendor must provide their own source of water via water truck, tanks, etc. for power washing. 2. Paint chips need to be contained and removed to prevent them from falling into the River.

Bid Results

Playgrounds / Parks / Athletic Fields

$72,530.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
252
Active Projects
97
Bidding Soon
1,329
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.