Black Friday through Cyber Monday: Get 10% off Project Intelligence

See pricing

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 10, 2022 at 8:00 PM

Updated September 15, 2023

Site work and new construction of a water / sewer project in Shelbyville, Kentucky. Completed plans call for the construction of a water / sewer project; and for site work for a water / sewer project.

Construction of a new Wastewater Treatment Plant (WWTP) with an average capacity of 2.3 million gallons per day (MGD) and a peak capacity of 7.0 MGD. The new WWTP will include a preliminary treatment facility, oxidation ditch, chemical feed building, secondary clarifiers, RAS/WAS pump station, peracetic acid contact basin, cascade aeration, sludge concentration basins, sludge holding tanks, administration building, and related site and piping work. Bidding Documents may be purchased from the Issuing Office during normal working hours. Cost does not include shipping charges. Upon Issuing Office's receipt of payment, paper Bidding Documents or electronic documents on compact disk will be sent via the prospective Bidder's delivery service. The shipping charge amount will depend on the shipping method chosen. For all further requirements regarding bid submittal, qualifications, procedures, and contract award, refer to the Instructions to Bidders that are included in the Bidding Documents.

Post-Bid

Water / Sewer

$10,000,000.00

Public - City

New Construction, Site Work

Subscribe For Documents

24 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
306
Active Projects
193
Bidding Soon
1,743
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 9, 2022

August 8, 2022

Project location map

To Be Determined, Shelbyville, KY

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed