BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a civil project in Bloomington, Illinois. Design plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

As of June 29, 2022, an engineer has been selected and this project is in the design phase. A firm timeline for construction has not been determined. The Illinois Environmental Protection Agency (IEPA) has provisionally authorized the City to discharge combined sewer overflow (CSO) effluent at Locust Street and Colton Avenue, with the requirement that the City eliminate combine sewer overflow (CSO) before the expiration of the provisional permit in 2030. The City intends to use borrowing and a portion of ARPA funds to construct Phase 4 and 5 of a multi-phase plan to eliminate that CSO. Final CSO elimination is expected to be complete in 2026, to maintain compliance with the IEPA permit. This project is in included in the City of Bloomington FY 2023 Capital Improvement Plan (CIP). *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Design

Roads / Highways

$2,190,000.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
481
All Active Projects
223
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 1, 2022

img_map_placeholder

Multiple Locations, Bloomington, IL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.