Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a road / highway in Bloomington, Illinois. Conceptual plans call for site work for a road / highway; and for paving for a road / highway.
As of August 9, 2022, this project is in the conceptual phase. An engineer has not been selected. Although a firm timeline for construction has not been determined, construction is not expected to start prior to August 2023. *The closed solicitation has been included below for reference: Administration officials expect the supply chain issues to self-correct, though they're cautious about asserting a specific timeframe because of the unprecedented nature of the recovery from the pandemic. They noted that a shortage of toilet paper when the pandemic started was fixed within weeks because factories could ramp up production. But in this case, Biden's White House views the problem in global terms, with many of the challenges being in Asian ports, rather than a problem that is solely domestic in nature. Republican lawmakers have placed the blame exclusively on Bidens $1.9 trillion coronavirus rescue package, saying the shortages are causing inflation that behaves like a tax by eating into workers salaries and savings. Outdoor furniture companies do say that finding workers has become more of a challenge in part because of the greater unemployment benefits, but they don't buy fully into the Republican line that government dollars have caused a lasting price bump. "The Biden inflation agenda of too much money chasing too few goods is causing major harm to hard-working families," House Republican Whip Steve Scalise of Louisiana said at a June hearing. The reality is not so simple for William Bew White III, who founded Summer Classics, an Alabama-based furnisher. He summarizes his problems as the three F's; foam, fabric and freight. follow the instructions to submit the electronic offer. Only Offerors following the project, with an active account, are eligible for the contract award. You may not respond with a faxed or paper copy submission. The City of Bloomington reserves the right to reject any and all RFQs and to waive technicalities, The award will be based on the criteria for selection contained within this document. The City of Bloomington requires ail Offerors doing business with the City not to discriminate on the basis of race, age, color, religion, gender. ancestry, national origin, marital status, mental or physical disability unrelated to ability. familial status or sexual orientation
Conceptual
Roads / Highways
$1,685,000.00
Public - City
Paving, Site Work
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 4, 2023
Multiple Locations, Bloomington, IL
Related To This Project
Bloomington, IL
Bid Date: Jun 27 2022
Bloomington, IL
--
Bloomington, IL
--
Bloomington, IL
Bid Date: Aug 31 2022
Bloomington, IL
Bid Date: Jul 15 2022
Bloomington, IL
Bid Date: Dec 07 2021
Bloomington, IL
Bid Date: Jan 14 2022
Bloomington, IL
Bid Date: Nov 18 2021
Bloomington, IL
Bid Date: Aug 03 2022
Bloomington, IL
Bid Date: Jul 29 2022
Bloomington, IL
Bid Date: May 14 2019
Bloomington, IL
Bid Date: May 03 2022
Bloomington, IL
Bid Date: Jun 27 2022
Bloomington, IL
Bid Date: Jun 28 2022
Bloomington, IL
Bid Date: Jun 28 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.