Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 12, 2022 at 8:00 PM

Updated September 14, 2023

Site work and new construction of a pre-engineered storage facility in Meadville, Missouri. Completed plans call for the construction of a pre-engineered storage facility; and for site work for a pre-engineered storage facility.

The Meadville R-IV School District will receive Bids for their New Bus Barn Work includes construction of a pre- engineered bus barn, concrete, and associated building systems.

Post-Bid

Warehouse / Distribution - Pre-Engineered Storage Building

$500,000.00

Public - City

New Construction, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
125
Active Projects
53
Bidding Soon
934
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 12, 2022

June 13, 2022

Project location map

To Be Determined, Meadville, MO


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed