Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published August 5, 2025 at 8:00 PM
Updated August 12, 2025
Renovation of a mixed-use development in Meadville, Missouri. Completed plans call for the renovation of a municipal facility.
City hall repairs (interior & exterior): damaged side wall metal, framing, window air conditioner, drywall patch & paint. Include materials & labor. New metal on south end of building Remove & replace framing, drywall and paint. Some electrical required. New window air conditioner Park bathroom modifications (interior): install FRP wall panels & PVC trim 8' ceiling height 2 adjoining bathrooms, one 6'5" x 7'4", one 7'3" x 7'4" Separate the bids by project. Bidders are informed that pursuant to Section 285.530 RSMo as a condition of the award of any contract in excess of five thousand dollars ($5000), the successful bidder shall, by sworn affidavit and provision of documentation, affirm its enrollment and docu-mentation, affirm its enrollment and participation in a federal work authorization program with respect to the employees working in connection to the contracted services. Successful bidders shall also sign an affidavit affirming that it does not knowingly employ any person who is an unauthorized alien in connection to the contracted services. No Bidder may withdraw his bid for a period of 60 days after the date of opening of bids. Bidders Are Informed That the Project is Subject to the Requirements of Section 292.675 Rsmo, Which Requires All Contractors or Subcontractors Doing Work on the Project to Provide, and Require Its on-site Employees to Complete, a Ten (10) Hour Course in Construction Safety and Health Approved by the Occupational Safety and Health Administration (Osha) or a Similar Program Approved by the Missouri Department of Labor and Industrial Relations That is at Least as Stringent as an Approved Osha Program. If on-site Employees Have Not Previously Completed Such Training, the Training Must Be Completed Within Sixty (60) Days of the Date, Work on the Project Commences. On-site Employees Found on the Worksite Without Documentation of the Required Training Shall Have Twenty (20) Days to Produce Such Documentation. The Owner Reserves the Right to Reject Any or All Bids. The Owner Further Reserves the Right to Waive Any Irregularities in Any or All Bids, and Reserves the Right to Determine Which is the Most Responsive. Responsible Bidder and to Reject or Approve the Bonds.
Post-Bid
Municipal
$50,000.00
Public - City
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 11, 2025
September 10, 2025
Multiple Locations, Meadville, MO
Related To This Project
Meadville, MO
Bid Date: Jul 30 2025
Meadville, MO
Bid Date: Jul 09 2025
Meadville, MO
Bid Date: Mar 20 2023
Meadville, MO
Bid Date: May 12 2022
Princeton, MO
Bid Date: Aug 15 2025
Newtown, MO
Bid Date: Aug 20 2025
Columbia, MO
Bid Date: Aug 29 2025
Springfield, MO
Bid Date: Aug 12 2025
Piedmont, MO
Bid Date: Aug 08 2025
Columbia, MO
Bid Date: Aug 11 2025
Saint Louis, MO
--
Dardenne Prairie, MO
Bid Date: Aug 22 2025
Carthage, MO
Bid Date: Aug 07 2025
Springfield, MO
Bid Date: Aug 14 2025
Arnold, MO
Bid Date: Aug 05 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
