BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Delhi, New York. Completed plans call for site work for a water / sewer project.

SUNY Delhi is Soliciting Quotes for Condensate Repair Manhole #3, Farrell Hall under our discretionary authority, pursuant to NYS Education Law 355(5)(a). A sealed bid will not be held. CR Number: 2086298 Service-Disabled Veteran-Owned Set Aside: No Minority Owned Sub-Contracting Goal: 15% Women Owned Sub-Contracting Goal: 15% Service-Disabled Veteran-Owned Business Contracting Goal: 6% Scope of Work: 1) Excavate Site, remove paver(s), stage materials at a location the College will provide a different location on site. a. Note failed utility is at a depth of 7'-0" plus, from finish grade - Shoring required. b. Campus to provide relocation of paver(s) once staged on pallet(s) c. Excavation equipment must be rubber pad or tires to avoid damage to surrounding paver(s)/ area. d. Campus will direct location to stage spoils. 2) Remove 4" condensate piping system from southern flange located inside manhole #3, to pipe system that is in good condition, exterior (South) of the manhole #3. 3) Prep remaining pipe system and weld condensate carrier pipe in place aliening interior flange. 4) Proceed with manufactures recommended repairs for piping system (Perma-Pipe System). Provide needed materials to insulate and provide pipe protection. a. If within 9' of flange. campus will supply piping system b. Materials needed but not limited to are piping system (if greater than 9' is required), link seal kit for manhole #3, piping system joint kit suggest you place a unit price for pipe, but not part of base bid. 5) Install link seal at manhole wall & joint kit at pipe connection 6) Provide flange (150# / 8 bolt for 4" pipe), gasket, bolts in manhole and make pressure tight connection. 7) Provide backfill in 6" lifts and compacted backfill to 95% compaction. Return subgrade to within 4" of finish paver surface. Work with college to establish final subgrade. a. Campus to reinstall paver(s) b. Campus to seed lawn area & landscape Disadvantaged Owned Sub-Contracting Goal: 6% Contract term: Work to begin within 10 Days after receipt of PO If you have questions regarding the documents, contact the issuing agency for more information.

Post-Bid

Water / Sewer

$2,000,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
191
Active Projects
109
Bidding Soon
1,545
All Active Projects
779
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 18, 2022

June 17, 2022

img_map_placeholder

649 Bronco Dr, Delhi, NY


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.