BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 29, 2022 at 8:00 PM

Updated October 24, 2023

Demolition, site work, outdoor lighting, renovation and addition to a mixed-use development in Winston Salem, North Carolina. Working plans call for the addition of a stadium; for the demolition of a stadium; for site work for a stadium; for the renovation of a office development; playground / park / athletic field; playground / park / athletic field; playground / park / athletic field; for outdoor lighting for a playground / park / athletic field; and water / sewer project.

As of September 26, 2022,this project is canceled. No definite date for the rebid. As owner of the baseball stadium, the City of Winston-Salem is funding upgrades to Truist Stadium at 951 Ballpark Way, Winston-Salem NC 27101 to meet the new mandatory MLB standards. This work includes improvements to the home and visiting team clubhouse areas; additional team facilities; and improvements to the playing field. The home team clubhouse will need upgrades to the commissary area and laundry facilities, along with expanding the equipment room. The visiting team clubhouse requires increasing the floor space of the dressing area; upgrades to the commissary, shower and toilet facilities, training room, and coaches' locker room; and a separate office, with amenities, for the visiting manager. Additional team facilities include adding a second hitting/pitching tunnel. Both tunnels must be protected from the elements. Improvements to the playing field include heights and slope of bullpen mounds, wall height in the rightfield corner, field drainage, and a review of existing lighting. The construction management at risk (CMR) method has been selected for delivering this project (as authorized by NCGS 143-128.1). The selected construction manager will manage both preconstruction and construction of the improvements. The construction manager will work with the City's architect during the preconstruction phase to design the project to the project budget. Preconstruction services will include, but are not limited to: project review, consultation during preconstruction services, value analysis, schedule, logistics plan, quality assurance/quality control, constructability review, construction cost model/estimates, coordination of contract documents, and development of a Guaranteed Maximum Price for construction. Construction should begin no later than when the 2023 baseball season begins, if possible.

Final Planning

Arenas / Stadiums

$5,000,000.00

Public - City

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
247
Active Projects
140
Bidding Soon
1,755
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 2, 2022

March 29, 2023

Project location map

951 Ballpark Wy, Winston Salem, NC

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.