BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 27, 2023 at 7:00 PM

Updated January 26, 2024

Site work and paving for a mixed-use development in Telluride, Colorado. Working plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

**As of February 27, 2023, project is on hold. No definite date for the rebid.**  This project is intended to enhance safety for pedestrian and bicycle traffic on two priority corridors within the Town of Mountain Village. Project elements include the addition of 6' paved shoulders on both sides of San Joaquin Road and the addition of curb and gutter sidewalk sections and ADA curb cuts along portions of Mountain Village Boulevard through Mountain Village Center. Question Acceptance Deadline 12/13/2022 02:00 PM EST Questions are submitted online No

Final Planning

Roads / Highways

$1,810,000.00

Public - City

Paving, Site Work

159

5

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
14
Active Projects
5
Bidding Soon
108
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 6, 2023

August 28, 2023

Project location map

Multiple Locations, Telluride, CO

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.