EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 27, 2022 at 8:00 PM

Updated October 1, 2024

Site work for a water / sewer project in Cleveland, Ohio. Completed plans call for site work for a water / sewer project.

In general, the work shall consist of furnishing all labor, materials, equipment, and incidentals for construction of the following work: Demolishing and removing existing concrete around the basin perimeter and removing the existing basin impoundment Dredging and disposing of existing sediments and regrading the basin Removing existing pipe segments and reinstalling new inlets and outlets Restoring the site. You will be given instructions to open the software application. Once signed on, ensure microphone, speaker and screen are working. e. We are asking that you provide your contact information in the "chat" function so that we can compile an attendees' list. Please include your name, company, affiliation, email address, and phone number. f. If you are having difficulty accessing the software, please contact Sara Lader at (216) 881-6600, X6052 or (216) 973-3503. Prospective bidders are strongly encouraged to frequently monitor the Bids website for project updates and addenda. The NEORSD will not be responsible or liable for project addenda that are not received by the bidder due to incorrect or out-of- date contact information. The NEORSD reserves the right to reject any and all Bids, to waive any informalities or irregularities in the Bids received. Bidders shall review the Instructions to Bids and all other contract documents prior to submitting a bid for this project. The successful Bidder also must comply with all the provisions of (a) The Davis-Bacon Act, (b) Contract Work Hours Standard Act, (c) The Copeland Act (Anti-Kickback) and (d) Title VI of the Civil Rights Act of 1964. The Contract will be subject to the NEORSD policies and goals regarding the use of minority, women, and small business enterprises (MBE/WBE/SBE) and the USEPA Disadvantaged Business Enterprise (DBE) Program. These policies are contained in the Contract Specifications. Individual program goals are as follows: USEPA DBE Program: 1.3% MBE and 1.0% WBE NEORSD MBE/WBE Program: 15% MBE/WBE NEORSD SBE Program: 5% SBE The Engineer's Estimate for the Upper Ridgewood Basin Improvements project is $3,900,000.00 All questions regarding the Contract Documents shall be directed to the Project Manager for the NEORSD, Derek Vogel at vogelD@neorsd.org and the Stormwater Design Manager, Kimberly Colich at colichk@neorsd.org.

Post-Bid

Water / Sewer

$3,900,000.00

Public - County

Site Work

Subscribe For Documents

38 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Special Procedures, Alteration Project Procedures, Quality Requirements, Regulatory Requirements, References, Definitions, Temporary Facilities and Controls, Temporary Utilities, Temporary Water, Vehicular Access and Parking, Haul Routes, Traffic Control, Temporary Barriers and Enclosures, Temporary Fencing, Execution and Closeout Requirements, Examination and Preparation, Field Engineering, Execution, Application, Erection, Closeout Submittals, Warranties
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Site Remediation, Facility Remediation, Transportation and Disposal of Hazardous Materials, Asbestos Remediation
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Accessories, Concrete Reinforcing, Reinforcing Steel, Welded Wire Fabric Reinforcing, Cast-in-Place Concrete, Structural Concrete, Concrete Curing, Grouting
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Dampproofing
Division 09 - Finishes

Division 09 - Finishes

Tiling, Painting and Coating, Painting
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Parking Control Equipment, Commercial Equipment, Office Equipment, Computers
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories, Bedroom Furnishings, Blankets
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing Equipment, Domestic Water Filtration Equipment
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Air Distribution, HVAC Ducts and Casings
Division 27 - Communications

Division 27 - Communications

Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Erosion and Sedimentation Controls, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Pruning, Bases, Ballasts, and Paving, Curbs and Gutters, Site Improvements, Fences and Gates, Planting, Planting Preparation, Mulching, Turf and Grasses, Seeding, Sodding, Plants, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Water Utilities, Water Utility Storage Tanks
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment, Coastal Construction, Shoreline Protection
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Lifting Devices, Hooks
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
136
Active Projects
98
Bidding Soon
1,243
All Active Projects
496
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 26, 2022

July 25, 2022

img_map_placeholder

To Be Determined, Cleveland, OH


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Upper Ridgewood Basin Improvements Project

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.