Published June 1, 2022 at 8:00 PM

Updated September 14, 2023

Site work for a water / sewer project in Hackberry, Texas. Completed plans call for site work for a water / sewer project.

Construction of approximately 7000 l.f. of 18" - 42" storm sewer within the existing streets of Hackberry, TX. Includes piping, inlets, structures, pavement repair, trench safety, traffic control and all appurtenances. Technical questions can be directed to the design engineer, Freeman-Millican, Inc. via email at mdhill@fmidallas.com or by telephone at 214-503-0555 x115. Bidders must submit, with their bids, a Cashier's Check or Certified Check in the amount of five percent (5%) of the maximum amount bid, payable without recourse to the City of Lavon, Texas, or a Proposal Bond in the same amount from a reliable Surety Company as guarantee that the Bidder will enter into a contract and execute bond and guarantee forms provided within ten (10) days after receipt of notice of award. The successful Bidder must furnish performance and payment bonds each in the amount of one hundred percent (100%) of the contract price from an approved Surety Company holding a permit from the State of Texas, to act as Surety and be acceptable according to the latest list of companies holding certificates of authority from the Secretary of Treasury of the United States, or other Surety or Sureties acceptable to the Owner. The Owner reserves the rights to reject any or all bids and to waive formalities.

Bid Results

Water / Sewer

$1,966,221.00

Public - City

Site Work

Subscribe For Documents

58 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Submittal Procedures, Certificates, Special Procedures, Alteration Project Procedures, Quality Requirements, Regulatory Requirements, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Closeout Submittals, Warranties
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Stone Assemblies
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Lifts
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Compaction, Shoring and Underpinning, Shoring, Sheet Piling
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Rigid Paving, Concrete Paving, Planting, Plants, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment, Coastal Construction, Shoreline Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Lifting Devices, Lifts

Find More Local Projects

Within 75 Miles of This Project
122
Active Projects
57
Bidding Soon
3,612
All Active Projects
1,321
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 26, 2022

June 27, 2022

img_map_placeholder

Multiple Locations, Hackberry, TX

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.