BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Columbia, South Carolina. Completed plans call for the renovation of a educational facility.

The purpose of this solicitation is to competitively obtain bids to acquire supplies, services or equipment which complies with the enclosed description and/or specifications and conditions for Richland School District Two for the following project: Removal of Existing and Installation of New HVAC Units at Spring Valley High School, 22-027. Question Submission Deadline:May 9, 2022, 12:00pm Richland School District Two will accept bids to remove existing and install new HVAC units at Spring Valley High School located at 120 Sparkleberry Lane, Columbia, SC 29223. This solicitation consists of three (3) units to be removed and replaced at this location. A Bid Bond is a requirement of the bid submittals. The Bid security shall be 5% of the total bid price provided. The school district reserves the right to waive any instruction, condition, or minor specification when considered to be in the best interest of the school district. 1. Removal of three (3) existing 15 ton roof top units (RTUs) 2. Existing Unit Type: Carrier RTU Heat Pump (Media Center) o Unit Voltage: 460V 3 phase o Unit Model: 50HJQ-016-621CD o Unit Serial: 1608U10206 3. Existing Unit Type: Carrier RTU Heat Pump (Media Center) o Unit Voltage: 460V 3 phase o Unit Model: 50HJQ-016-621CD o Unit Serial: 1608U10207 4. Existing Unit Type: Carrier RTU Heat Pump (Band Room) o Unit Voltage: 460V 3 phase o Unit Model: 50TJ-016-680YA o Unit Serial: 1001F67792 Installation: Provide, install, and connect new units: o Replace three (3) 15 ton roof top (RTUs) Heat Pump Units o Contractor shall coordinate with Johnson Control Inc. to disconnect and reconnect building automation systems. o Units must have dehumidification with reheat. Units must have an economizer package. o Units must have 36 kw electric heat strips. o Units must have phase monitor protection. o Unit must have filter racks installed in the units. o Contractor shall guarantee that the newly installed equipment is functioning as defined by the manufacturer. o Contractor must also provide a one (1) year labor warranty. Project must be completed within 15 days of contractor's receipt of the replacement unit(s).

Award

Educational

$200,000.00

Public - County

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
98
Active Projects
50
Bidding Soon
786
All Active Projects
383
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 17, 2022

June 17, 2022

img_map_placeholder

120 Sparkleberry Ln, Columbia, SC

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.