BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Clarkston, Washington. Completed plans call for site work for a water / sewer project.

The magnitude of construction is estimated to be between $5,000,000 and $10,000,000 SCOPE This section specifies the requirements for dredging within the designated areas as indicated. Dredging will include the disposal of all materials within the limits of the disposal area. Dredging sites are as follows: 1. Ice Harbor Navigation Lock Approach 2. Snake/Clearwater River Confluence Site: A. Navigation Channel B. Clarkston Crane Dock Maintenance Area C. Clarkston Grain Dock Maintenance Area D. Clarkston Recreation Dock Maintenance Area E. Clarkston Cruise Line Dock Maintenance Area F. Clarkston Grain and Recreation Docks Access Channel G. Clarkston Cruise Line Dock Access Channel H. Lewiston Grain Dock Maintenance Area COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984) The Contractor shall be required to (a) Commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than the dates listed below. In-water work window is (December 15 2022 through March 1 2023). Anticipated FY23 Navigation Lock Outage: March 2023 Navigation Lock Maintenance Closure Project Closes Reopens McNary 6:00 a.m., 4 March 2023 11:59 p.m., 25 March 2023 Ice Harbor 6:00 a.m., 4 March 2023 11:59 p.m., 25 March 2023 Lower Monumental 6:00 a.m., 4 March 2023 11:59 p.m., 25 March 2023 Little Goose 6:00 a.m., 4 March 2023 11:59 p.m., 25 March 2023 Lower Granite 6:00 a.m., 4 March 2023 11:59 p.m., 25 March 2023 ACCESS FOR FOREIGN NATIONALS: SITE VISIT AND CONTRACT WORK: Security clearance for foreign nationals to attend a site visit or to perform onsite work requires a minimum of 5 weeks prior to site visit or onsite work. Please send documentation by email (.pdf files are preferred) to david.c.boone@usace.army.mil and jani.c.long@usace.army.mil Acceptable forms of documentation include: A US passport, Certificate of US citizenship (INS Form N-560 or N-561), Certificate of Naturalization (INS Form N-550 or N-570), foreign passport with I-551 stamp or attached INS Form I-94 indicating employment authorization, Alien Registration Receipt Card with photograph (INS Form I-151 or I-551), Temporary Resident Card (INS Form I-688), Employment Authorization Card (INS Form I-688A), Reentry Permit (INS Form I-327), Refugee Travel Document (INS Form I-571), Employment Authorization Document issued by the INS which contains a photograph (INS Form I-688B). Foreign nationals must have received clearance prior to being granted access to the project site. PROFIT: Alternate structured approaches -- Construction contracts. [UDG 5115.404-73-1] Weighted guidelines method of determining profit shall be used on any equitable adjustment change order or modification issued under this contract. The profit factors shall be as stated below. (1) The following alternate structured approach shall be used for all firm-fixed price construction in accordance with W912EF22B0005 Page 42 of 55 Defense Federal Acquisition Regulation Supplement (DFARS) 215.404-4(b)(1). For all other actions, the weighted guidelines method described at DFARS 215.404-71 shall be used. (1) The Contractor shall complete all in waterwork work by not later than February 28th. For questions about the ProjNet Bidder Inquiry, please contact the Call Center help desk toll free at 1-800-428- HELP, which operates from 8AM to 5PM (Central US time zone). Bidder inquiry help questions can also be emailed to the helpdesk at staff@rcesupport.com. NOTICE: All bidders/offerors will be held to have reviewed the questions and responses in Bidder Inquiry prior to bid submission. Nothing is changed in the solicitation unless an amendment is issued. BONDS: If the successful offeror, upon acceptance of its offer by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed payments bonds or alternate payment protection within 10 Calendar days after receipt of the contract award forms by the offeror, the Contracting Officer may terminate the contract for default/cause. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Bid Results

Water / Sewer

$5,818,400.00

Public - Federal

Site Work

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
16
Active Projects
7
Bidding Soon
211
All Active Projects
63
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

September 9, 2022

December 22, 2022

March 8, 2023

img_map_placeholder

Multiple Locations, Clarkston, WA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.