This is a service / maintenance or supply contract in Shelbyville, Illinois. Contact the soliciting agency for additional information.

Sources Sought Notice REVETMENT/ AT LAKE SHELBYVILLE DAM CONTRACT INFORMATION: The U.S. Army Corps of Engineers (USACE), St. Louis District, is seeking businesses that are interested in and capable of performing shoreline revetment work by placing riprap along the edge of Lake Shelbyville located in on the Kaskaskia River in Shelby County, Illinois. Contract is anticipated to be a base contract with 4 optional years with the typical Period of Performance for a task order to be 365 days, based on lake elevation and flow constraints. This announcement is for information and planning purposes only and is not to be construed as a commitment by the Government, implied or otherwise, to issue a solicitation or make a contract award. NO AWARD will be made from this Sources Sought Notice. This is NOT a request for proposal, quote or invitation for bid. The sole purpose of this notice is to identify potential System for Award Management (SAM) Database registered businesses that are interested and capable of performing this work. USACE is not responsible for any costs incurred by interested parties in responding to this Sources Sought. PROJECT DESCRIPTION: The work covered by this contract consists of furnishing all labor, equipment, and materials necessary for the mobilization and installation of offshore breakwater structures within the Lake Shelbyville Project boundary line. All excavation, site preparation, backfilling, and placement of riprap along the shoreline shall require the use heavy equipment, work barge and/or boat, and dump trucks. Some areas are accessible by land. All Riprap shall be contractor furnished and have a quality designation of "A" as per Illinois Department of Transportation (IDOT) standards. Contract Areas and Construction limits: The primary contract areas are located on the shoreline of Lake Shelbyville located in Shelbyville, IL within the Illinois Counties of Shelby and Moultrie. Work associated with this requirement includes, but is not limited to: mobilization, de-mobilization and site preparation to include the installation of a suitable loading area that allows for riprap barge access and material deployment; installation of offshore breakwater structures through the placement of riprap on top of geotextile according to contract specifications. Order of work will be highly dependent on lake levels and weather. The contractor shall monitor daily the lake levels so that work schedules can be adjusted accordingly. Contractor may be required to suspend and re-commence operations throughout the work duration if lake levels get too high for riprap placement Required Trades: The contractor shall have the capabilities of supplying trades including, but not limited to laborers, heavy equipment operators, dump truck drivers, barge/boat operators, and professional engineering services. Required certifications: Any state or local Government permits to include but not limited to IDNR, IEPA, Moultrie and Shelby County permits for hauling material or stormwater runoff, etc. All 404 permits will be the responsibility of the Lake Shelbyville Project Office. Required Equipment: The contractor shall have the capabilities of supplying multiple pieces of equipment including, but not limited to, the types of equipment as described below for performance of work: Dump trucks for hauling riprap USCG-certified barges/boats rated for the work described Front-end loader and other equipment to move/haul/place riprap CAPABILITY STATEMENT: 1. Please provide examples of work, "indicating equipment utilized" that your company has performed in the areas listed below; if work was sub-contracted, please annotate this. No more than (3) three projects in any area of work performed. Describe past work experience showing all or more than one of the areas listed that were performed under one contract. Areas of work involving characteristics that are similar to the types of work described herein: Shoreline Revetment projects utilizing vessels to place riprap 2. Please provide business information in the following format: Business Name: Point of Contact: (Name/Phone/Email) Address: Business Size: (Large/Small/8(A)) Cage Code: 4. Any information submitted by the respondents to this Sources Sought Notice is strictly voluntary. The Government will not pay for any information that is submitted by respondents to this Sources Sought Notice. The Government requests interested firms submit their capability statement and experience response no later than 10:00am, CST, on 16 May 2022 by email to twila.a.hopkins2@usace.army.mil. Please direct any questions on this announcement to Twila Hopkins at the above email. NAICS CODE: 237990 Other Heavy and Civil Engineering Construction SIZE STANDARD: $39.5M CONTRACT ESTIMATED RANGE: $24M POINT OF CONTACT: Responses are to be sent via email to Twila Hopkins, twila.a.hopkins2@usace.army.mil no later than 10:00 a.m. CST, 16 May 2022. SUBMISSION DETAILS: All interested, responsive and responsible System of Award Management (SAM) Database registered businesses are encouraged to participate in this sources sought by emailing the required information below to the point of contact. If your company is not SAM registered, please do so at www.sam.gov. The method of contractor selection has not been determined at this time.

Conceptual

Water / Sewer

$24,000,000.00

Public - Federal

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
53
Active Projects
26
Bidding Soon
426
All Active Projects
175
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 16, 2023

img_map_placeholder

To Be Determined, Shelbyville, IL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.