BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a civil project in Astoria, Oregon. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

The intent of this contract is to replace the existing waterlines serving each side of Rivington Avenue with one waterline that will serve both sides of the street. The following is a summary of the major elements of Work that are to be provided by the Contractor. 1. Construction of 400 LF of 8-inch diameter C900 PVC waterline 2. Construction of new water services 3. Installation of two new fire hydrants 4. Replacement of sections of existing combined sewer laterals and two wyes in the sewer main 5. Restoration of existing Portland cement concrete and asphaltic concrete surfaces 6. Asphalt overlay 7. Temporary traffic control 8. Erosion control Project Substantial Completion shall be 45 days from Notice to Proceed and Project Final Completion shall be 60 days from Notice to Proceed Questions regarding the project during the bid period shall be submitted to John Edwards, P.E., City of Astoria via phone at 503-338-5173 or email at jedwards@astoria.or.us. Bids will be publicly opened and read by the Public Works Director at 2:00 PM, local time on May 19, 2022 in the Astoria City Council Chambers. All bids must be accompanied by a certified check, a cashier's check or bid bond in an amount equal to at least 5% of the total bid. If the total bid exceeds $50,000.00 the contract will be subject to Prevailing Wage Statute ORS 279C.800 to 279C.870. The contract is NOT subject to federal prevailing wage rates under the Davis-Bacon Act (40 U.S.C. 3141 et seq). Prequalification of bidders is required. Forms may be obtained from the Engineering Division Office, 1095 Duane Street, Astoria, OR 97103, (503) 338-5173. Prequalification applications must be received at the above location no less than seven (7) calendar days prior to bid opening. Required minimum prequalification class(es) of work for the Contractor (or Contractor in combination with proposed subcontractor(s)) for this contract are: Earthwork Waterlines Asphaltic Concrete Paving Prior to submission of its bid, bidder shall be registered with the Oregon Construction Contractor's Board as required by ORS 701.055, and thereafter comply with the requirements of ORS 701.035 to 701.055. Bidders shall be qualified in accordance with the applicable parts of ORS 279C in order to submit a bid for public works in Oregon. The engineers estimate for construction costs is $180,000 - $210,000. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. PROJECT DESCRIPTION The intent of this contract is to replace the existing waterlines serving each side of Rivington Avenue with one waterline that will serve both sides of the street. The following is a summary of the major elements of Work that are to be provided by the Contractor. 1. Construction of 400 LF of 8-inch diameter C900 PVC waterline 2. Construction of new water services 3. Installation of two new fire hydrants 4. Replacement of sections of existing combined sewer laterals and two wyes in the sewer main 5. Restoration of existing Portland cement concrete and asphaltic concrete surfaces 6. Asphalt overlay 7. Temporary traffic control 8. Erosion control

Award

Water / Sewer

$217,052.00

Public - City

Paving, Site Work

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
65
Active Projects
29
Bidding Soon
603
All Active Projects
284
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 19, 2022

June 20, 2022

img_map_placeholder

Rivington St, Astoria, OR


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.