BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a residential development in Windsor, Connecticut. Completed plans call for the renovation of a residential development.

The following is an outline of the Scope of Work. This Scope of Work includes all labor and materials required to perform the construction work as described below. The contractor is responsible for obtaining permits; providing complete, thorough, and compliant services to all work; and for coordinating as appropriate with the work of all other trades specified elsewhere. All work must be performed in compliance with all applicable National, State, and Local Codes This project is funded by the Department of Housing and Urban Development (HUD) and requires the use of lead safe work practices under 24 CFR Part 35 (Lead Based Paint Poisoning Prevention and Control in Certain Residential Structures). A Lead Inspection and Risk Assessment were performed on April 11, 2022 at this property by EnviroPlan, LLC. Lead hazards were not found. A. Remove existing roofing up to two layers, gutter & leaders on home/garage and dispose of properly. a) Replace degraded sheathing ($120.00 allowance per sheet allowance) b) Photograph any rot damage to sheathing and then any replaced sheets and send to Housing Rehab Specialist before roofing c) Provide and install first two courses with Ice and Water Membrane per GAF requirements (low sloped roofs between 2.12 and 4.12 pitch to be entirely covered with Ice and Water Membrane d) Install new lifetime architectural asphalt shingles manufactured by GAF on pitch greater than 2.12 and GAF Liberty SBS self-adhering cold applied asphalt roofing on low slope roofs less than 2.12 pitch e) Provide and install aluminum "drip" and "rake" edge flashing f) Replace all vents g) Color to be chosen by owner from manufacturers standard pipe and ventilation flashing systems, including but not limited to waste vents, bathroom, range and dryer ventilation h) Install new continuous ridge vent per GAF requirements i) Verify soffit ventilation, install vents as needed j) All work to be performed per building code requirements k) Refer to specifications for all work a) Replace existing chimney counter flashing with new copper flashing b) Remove Tar and Scarify existing brick masonry c) Install reglet joints and use masonry caulk at joint d) Solder all joints with lead solder e) All work to be performed per building code requirements f) Refer to specifications for all work g) Patch shingle with like material. h) All work to be performed per building code requirements i) Refer to specifications for all work 2) Gutters- Division 7 A. Remove and Install new aluminum ogee style seamless gutters and 2 x3 leaders a) Located on the "A-D" facades b) Utilize appropriate hangers c) Install new downspouts, accordingly, connect to existing drainage inverts or provide elbows and splash blocks d) Color to be chosen by owner 3) Smoke and Carbon Monoxide Detectors - Division 21 A. Provide and install new combination smoke detectors a. Located outside bedrooms (2) and at basement stairs. B. Provide and install smoke detectors, one in each bedroom (3) a) All detectors to be battery operated b) All work to be performed per building code requirements c) Refer to specifications for all work 4) Electrical - Division 26 A. Install GFCI protection at the following receptacles a) Located at kitchen counter "c" wall. b) Bathroom "c" wall. c) Verify integrity of box, wiring and ground d) Install new covers, matching existing color and style B. All work to be performed per building code requirements C. Refer to specifications for all work 5) WindowsA. Remove existing double hung windows. a) 2 total DH windows. b) Verify size c) Paint or stain new or disturbed work d) Install insulation in cavities and caulk all edges e) All windows to be manufactured by Mercury Excelum (with energy star glazing package) or an approved equal. f) All units to be white g) All operable units to include full standard fiberglass mesh screens h) Refer to specifications for additional information i) All work to be performed to code requirements -All proposals must include (1) one original and (1) copy of the following: o Invitation to Bid (Part 1) o Bid Proposal Form (Part 4Addenda (if applicable) -Attach and complete bid envelope label. For further questions; please contact Tom Foley, Signal Rock Consulting, Rehabilitation Consultant, 11 Clinton Street Milford, CT 06460 Office # (203) 446-6468 Should you have any questions please contact the office at (860) 285 1985.

Post-Bid

Residential Subdivision

$12,500.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
424
Active Projects
244
Bidding Soon
3,779
All Active Projects
1,615
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 18, 2022

June 17, 2022

img_map_placeholder

335 Deerfield Rd, Windsor, CT

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.