Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of a residential development in Windsor, Connecticut. Completed plans call for the renovation of a residential development.
The following is an outline of the Scope of Work. This Scope of Work includes all labor and materials required to perform the construction work as described below. The contractor is responsible for obtaining permits; providing complete, thorough, and compliant services to all work; and for coordinating as appropriate with the work of all other trades specified elsewhere. All work must be performed in compliance with all applicable National, State, and Local Codes This project is funded by the Department of Housing and Urban Development (HUD) and requires the use of lead safe work practices under 24 CFR Part 35 (Lead Based Paint Poisoning Prevention and Control in Certain Residential Structures). A Lead Inspection and Risk Assessment were performed on April 11, 2022 at this property by EnviroPlan, LLC. Lead hazards were not found. A. Remove existing roofing up to two layers, gutter & leaders on home/garage and dispose of properly. a) Replace degraded sheathing ($120.00 allowance per sheet allowance) b) Photograph any rot damage to sheathing and then any replaced sheets and send to Housing Rehab Specialist before roofing c) Provide and install first two courses with Ice and Water Membrane per GAF requirements (low sloped roofs between 2.12 and 4.12 pitch to be entirely covered with Ice and Water Membrane d) Install new lifetime architectural asphalt shingles manufactured by GAF on pitch greater than 2.12 and GAF Liberty SBS self-adhering cold applied asphalt roofing on low slope roofs less than 2.12 pitch e) Provide and install aluminum "drip" and "rake" edge flashing f) Replace all vents g) Color to be chosen by owner from manufacturers standard pipe and ventilation flashing systems, including but not limited to waste vents, bathroom, range and dryer ventilation h) Install new continuous ridge vent per GAF requirements i) Verify soffit ventilation, install vents as needed j) All work to be performed per building code requirements k) Refer to specifications for all work a) Replace existing chimney counter flashing with new copper flashing b) Remove Tar and Scarify existing brick masonry c) Install reglet joints and use masonry caulk at joint d) Solder all joints with lead solder e) All work to be performed per building code requirements f) Refer to specifications for all work g) Patch shingle with like material. h) All work to be performed per building code requirements i) Refer to specifications for all work 2) Gutters- Division 7 A. Remove and Install new aluminum ogee style seamless gutters and 2 x3 leaders a) Located on the "A-D" facades b) Utilize appropriate hangers c) Install new downspouts, accordingly, connect to existing drainage inverts or provide elbows and splash blocks d) Color to be chosen by owner 3) Smoke and Carbon Monoxide Detectors - Division 21 A. Provide and install new combination smoke detectors a. Located outside bedrooms (2) and at basement stairs. B. Provide and install smoke detectors, one in each bedroom (3) a) All detectors to be battery operated b) All work to be performed per building code requirements c) Refer to specifications for all work 4) Electrical - Division 26 A. Install GFCI protection at the following receptacles a) Located at kitchen counter "c" wall. b) Bathroom "c" wall. c) Verify integrity of box, wiring and ground d) Install new covers, matching existing color and style B. All work to be performed per building code requirements C. Refer to specifications for all work 5) WindowsA. Remove existing double hung windows. a) 2 total DH windows. b) Verify size c) Paint or stain new or disturbed work d) Install insulation in cavities and caulk all edges e) All windows to be manufactured by Mercury Excelum (with energy star glazing package) or an approved equal. f) All units to be white g) All operable units to include full standard fiberglass mesh screens h) Refer to specifications for additional information i) All work to be performed to code requirements -All proposals must include (1) one original and (1) copy of the following: o Invitation to Bid (Part 1) o Bid Proposal Form (Part 4Addenda (if applicable) -Attach and complete bid envelope label. For further questions; please contact Tom Foley, Signal Rock Consulting, Rehabilitation Consultant, 11 Clinton Street Milford, CT 06460 Office # (203) 446-6468 Should you have any questions please contact the office at (860) 285 1985.
Post-Bid
Residential Subdivision
$12,500.00
Public - City
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 18, 2022
June 17, 2022
335 Deerfield Rd, Windsor, CT
Related To This Project
Windsor, CT
Bid Date: Mar 26 2019
Windsor, CT
Bid Date: Oct 31 2018
Windsor, CT
Bid Date: Mar 15 2019
Windsor, CT
Bid Date: Nov 20 2018
Windsor, CT
Bid Date: Feb 27 2019
Windsor, CT
Bid Date: Jul 31 2019
Windsor, CT
Bid Date: Jun 05 2019
Windsor, CT
--
Windsor, CT
Bid Date: Nov 20 2018
Windsor, CT
Bid Date: Aug 05 2019
Windsor, CT
Bid Date: Feb 28 2020
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.