BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Remodeling of a municipal facility in Fairfield, California. Completed plans call for the remodel of a municipal facility.

The California Conservation Corps (CCC) Solano Center, who leases our current facility from the Suisun-Fairfield Sewer District, needs a general building contractor to remodel an existing room into a laundry facility which will house one (1) washer and one (1) dryer unit. The project will consist of demolition, electrical, plumbing and drywall installation. CCC Solano Center - 1020 Chadbourne Road Fairfield, CA 94534 The term of this Agreement is upon approvals through 12/31/2022. Maintain a valid current B- General Building License issued by the California Contractors State Licensing Board. Said license shall remain active and in good standing with the State of California throughout the duration of this contract. Anticipated Award Date 6/3/2022 Deadline to ask Questions 5/23/2022 at 4:00PM The estimated budget of this Agreement is $12,000.00. 1. demolition of existing shelving, water heater, sink and countertops. 2. install approximately 50 lf of 3/4 in. emt conduit from the existing electrical panel to the outlet location. the exact location of the outlet will be provided at the time of the bid walk. 3. install one (1) 30 amp commercial grade single-pole circuit breaker. a representative from the fssd facilities department will assist in determining specific requirements and information regarding the existing electrical panel. 4. install one (1) 30 amp commercial grade dryer outlet. 5. install junction boxes, and cover plates as needed to complete the project to current cbc standards. 6. install a new 10-gallon 208-volt 3kw 1-phase electric tank water heater with wall mount kit. see attachment a for specifications. 7. install a 1/2 in. brass x 3/4 in. male hose thread washing machine outlet box. see attachment b for specifications. 8. install 1/2 in. copper water supply lines (hot and cold) from the water heater to the washing machine outlet box. 9. tie washing machine outlet box drain into existing plumbing and vent stack. 10. install floor drain grill cover on existing plumbing. 11. install/finish sheetrock as needed. 12. remove/reinstall metal door frame to allow for the installation of the washer and dryer units.

Award

Municipal

$12,974.00

Public - State/Provincial

Remodeling

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
170
Active Projects
94
Bidding Soon
1,871
All Active Projects
699
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 26, 2022

June 1, 2022

img_map_placeholder

1020 Chadbourne Rd, Fairfield, CA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.