BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Renovation of a transportation facility in Sacramento, California. Completed plans call for the renovation of a transportation facility.

**As of July 25, 2022, this project has not yet been awarded. A timeline for award has not yet been established.** The County of Sacramento Department of Airports is seeking a qualified firm, partnership, corporation, association, persons, or professional organizations as construction manager at-risk ("CMAR" or "Firm") to perform pre-construction and construction services for the Sacramento International Airport Terminal A Restroom Rehabilitation Project (Project). The new design of the restrooms follows several principles: Increase privacy and safety by providing private individual water closet rooms Increase comfort and experience with a more open space, better-balanced lighting, and implementing calming color schemes Increase ease of maintenance by consolidating areas that require frequent attention and servicing Increase user-friendliness by incorporating modern sensor activated devices and smart technologies Maximize space layout by arranging spaces according to activities and providing flexibility for future modifications and conversions The Department envisions construction to be completed no later than June 2024 or sooner. In general, the selected CMAR delivery method will involve two parts: Preconstruction services including review of the design documents and cost estimate prepared by the County's consulting architect, value engineering (VE) and constructability/means and methods analysis, and recommendations for design changes. Additional preconstruction services to prepare an overall project schedule, draft cost estimates and final cost proposal in the form of a Guaranteed Maximum Price (GMP), and Construction of the project The Department of Airports will be seeking a Federal Grant for this work. The estimated total construction cost for the Project is $8 Million. The project cost including construction and all other soft costs, allowances and contingencies is estimated to be $12 Million.

Post-Bid

Transportation Terminals

$8,000,000.00

Public - County

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
139
Active Projects
80
Bidding Soon
1,424
All Active Projects
603
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 16, 2022

August 15, 2022

img_map_placeholder

6900 Airport Blvd, Sacramento, CA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.