Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
This is a service / maintenance or supply contract in Evergreen Park, Illinois. Contact the soliciting agency for additional information.
Job No. C-91-195-18, US 20 at IL 31, Phase III Project, Cook County, Region One/District One . This project may contain Federal Funds. This project requires 25% DBE participation, or if the contract goal is not met, documented evidence of good faith efforts. The Complexity Factor for this project is 0. The Consultant who is selected for this project and all Subconsultants the Prime Consultant will be using are scheduled to attend an initial meeting on August 4, 2022, at 12:00 PM at the Region One/District One Office in Schaumburg. Phase III engineering is required to provide construction inspection services for the above subject improvement. Work includes, but is not limited to, the replacement of the existing bridge structure carrying IL 31 over US 20 and reconstruction of the interchange ramp intersections. The existing single span bridge will be replaced with a wider and longer two-span structure with the center pier located in the median of US 20 that will accommodate left turn lanes from IL 31 in each direction and increased lateral and vertical clearances on US 20. Right turn lanes will also be added from IL 31 to each entrance ramp. The project also includes interchange lighting, traffic signal modernization, provisions for pedestrian and bicyclist drainage system improvements. Maintenance of traffic will utilize staged construction and a detour for ramp reconstructions, as well as all incidental and collateral work necessary to complete the project as shown on the plans and as described herein. The following structures may be in this project: o S.N. 045-0017: Existing IL 31 bridge over US 20 o S.N. 045-2106: Proposed IL 31 bridge over US 20 The anticipated construction completion date is October 31, 2024, plus ten (10) working days. The Consultant must complete and submit final measurements, calculations, and final contract records documents to the department no later than six (6) weeks after the completion of the project. The Prime firm must be prequalified in the Special Services (Construction Inspection) category to be considered for this project. Statements of Interest, including resumes of the key people noted above, must be submitted electronically to the Central Bureau of Design and Environment through the Engineering Prequalification and Agreement System (EPAS). The firm acting as the prime must be prequalified in all the prequalification categories requested in the project advertisement even if they plan to subcontract part of the project, except where noted in a specific project advertisement. Any work being done by a consultant, prime or sub must be prequalified in the IDOT prequalification category of work they are performing. Questions concerning this Bulletin should be directed to: E-mail: DOT.ConsultantServices@illinois.gov Or mailing address: Bureau of Design and Environment 2300 South Dirksen Parkway Attn: Consultant Unit Room 330 Springfield, IL 62764 The method of contractor selection has not been determined at this time. IDOT - 005 - RFQ - US 20 at IL 31, Phase III Project, Cook County
Design
Bridges / Tunnels
Public - State/Provincial
Service, Maintenance and Supply
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 25, 2022
US-20, Evergreen Park, IL
Related To This Project
Evergreen Park, IL
Bid Date: Jun 01 2020
Evergreen Park, IL
Bid Date: Mar 01 2023
Evergreen Park, IL
Bid Date: Mar 28 2023
Evergreen Park, IL
Bid Date: Mar 14 2023
Evergreen Park, IL
Bid Date: May 11 2023
Evergreen Park, IL
Bid Date: May 23 2023
Evergreen Park, IL
Bid Date: Mar 15 2022
Evergreen Park, IL
Bid Date: Mar 02 2022
Evergreen Park, IL
Bid Date: Apr 18 2022
Evergreen Park, IL
Bid Date: Apr 01 2022
Evergreen Park, IL
Bid Date: Apr 01 2022
Evergreen Park, IL
Bid Date: Mar 29 2022
Evergreen Park, IL
Bid Date: Mar 29 2022
Evergreen Park, IL
Bid Date: Apr 20 2022
Evergreen Park, IL
Bid Date: Apr 20 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.