EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 23, 2022 at 8:00 PM

Updated January 26, 2024

Site work and paving for a mixed-use development in Appleton, Wisconsin. Working plans call for site work for a educational facility; for paving for a educational facility; sidewalk / parking lot; sidewalk / parking lot; water / sewer project; and water / sewer project.

As of May 23, 2022 bids were canceled. No definite date for the rebid. Sidewalks/Curbs/Gutters, Retaining Walls, Concrete/Formed/Flatwork/Foundation, Buildings and Grounds/Athletic/Sports Facilities, Concrete Pavement, Electrical Installation/Construction, Fencing/Guardrails/Handrails, Excavation, Stormwater Improvements, Irrigation, Landscaping - Seeding, Erosion Control - Temporary, Electrical, Paving (Asphalt or Concrete), Parks, Recreation, Athletic & Aquatic Facilities, Directional Drilling, Sitework/Excavating and Grading, Grubbing & Clearing Description: The work, for which bids are asked, generally includes the following: CONTRACT "A" - GENERAL SITE CONSTRUCTION 1. Running Track and Athletic Field Improvements including stripping topsoil, placing and screening topsoil, earthwork, erosion control, dense graded base, concrete flatwork, storm sewer, asphalt pavement, irrigation, fencing, seeding, sodding, restoration and athletic equipment. 2. Alternate Bids as represented in the Contract Documents. 3. All necessary work to complete the proposed contract as represented in the construction documents shall be included in the CONTRACTOR'S bid. CONTRACT "A, ALTERNATE A1" - REVISED MILESTONE COMPLETION DATES 1. State the amount to be deducted to the base bid with the extended milestone completion dates as indicated in the specifications. 2. All necessary work to complete the proposed alternate as represented in the construction documents shall be included in the CONTRACTOR'S bid. CONTRACT "B" - ELECTRICAL SITE CONSTRUCTION 1. Electrical construction for the site with work including, but not limited to, service, conduits, panels, switches, receptacles, outlets, light fixtures, wiring, re-wiring, site lighting, athletic lighting, excavation, backfilling, compaction, concrete bases, disposal of excess material, and utility coordination. 2. Alternate Bids as represented in the Contract Documents. 3. All necessary work to complete the proposed contract as represented in the construction documents shall be included in the CONTRACTOR'S bid. CONTRACT "B, ALTERNATE B1" - PRESS BOX ELECTRICAL & TELECOMMUNICATIONS 1. State the amount to be added to the base bid to provide electrical and telecommunications to press box as indicated on the drawings and in the specifications. 2. All necessary work to complete the proposed alternate as represented in the construction documents shall be included in the CONTRACTOR'S bid. CONTRACT "B, ALTERNATE B2" - REVISED MILESTONE COMPLETION DATES 1. State the amount to be deducted to the base bid with the extended milestone completion dates as indicated in the specifications. 2. All necessary work to complete the proposed alternate as represented in the construction documents shall be included in the CONTRACTOR'S bid. WORK BY OTHERS Work by others or OWNER that shall be concurrent to work of this contract includes the following: 1. Contract "C" - GRANDSTANDS - Providing and installing grandstands will be procured under a separate bidding process. Work of these contracts shall be coordinated with grandstand construction. 2. Contract "D" - TRACK SURFACING - Providing and installing track surfacing system will be procured under a separate bidding process. Work of these contracts shall be coordinated with track surfacing construction.

Final Planning

Educational

$240,000.00

Public - City

Paving, Site Work

19

16

4

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Summary of Work, Work by Owner, Work Restrictions, Use of Site, Price and Payment Procedures, Contract Modification Procedures, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Construction Facilities, Vehicular Access and Parking, Traffic Control, Temporary Controls, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Existing Products, Cutting and Patching, Cleaning and Waste Management, Progress Cleaning, Closeout Submittals, Bonds, Warranties, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Subsurface Investigation, Material Testing
Division 03 - Concrete

Division 03 - Concrete

Cast-in-Place Concrete, Concrete Curing, Precast Concrete, Precast Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Concrete Unit Masonry, Stone Assemblies
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Fire and Smoke Protection, Firestopping
Division 08 - Openings

Division 08 - Openings

Windows, Hardware
Division 09 - Finishes

Division 09 - Finishes

Tiling, Ceilings
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Parking Control Equipment, Parking Key and Card Control Units, Entertainment Equipment, Athletic Equipment, Recreational Equipment
Division 13 - Special Construction

Division 13 - Special Construction

Special Structures, Fabricated Engineered Structures
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Scaffolding
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Grounding and Bonding for Electrical Systems, Hangers and Supports for Electrical Systems, Identification for Electrical Systems, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Switchboards and Panelboards, Panelboards, Low-Voltage Distribution Equipment, Wiring Devices, Low-Voltage Circuit Protective Devices, Fuses, Lighting, Interior Lighting, Interior Lighting Fixtures, Lamps, And Ballasts, Exterior Lighting
Division 27 - Communications

Division 27 - Communications

Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Access Control and Intrusion Detection
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Fine Grading, Excavation and Fill, Subgrade Preparation, Excavation, Trenching, Dewatering, Fill, Backfill, Compaction, Erosion and Sedimentation Controls, Earthwork Methods, Soil Stabilization, Shotcrete Soil Slope Stabilization, Special Foundations and Load-Bearing Elements, Special Foundations, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Operation and Maintenance of Planting, Fertilizing, Bases, Ballasts, and Paving, Curbs and Gutters, Planting, Planting Preparation, Soil Preparation, Landscape Grading, Turf and Grasses, Seeding, Sodding, Plants, Shrubs, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment, Coastal Construction, Shoreline Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
47
Active Projects
27
Bidding Soon
561
All Active Projects
203
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 26, 2022

June 9, 2022

img_map_placeholder

1100 E South River St, Appleton, WI


Find. Bid. Win. Your Next Project Starts Here.

Get the right
data with Project Intelligence

Share with your network.

Lawrence University - Whiting Field Phase 1 - Track and Field Site Redevelopment Project

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.