BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 5, 2022 at 8:00 PM

Updated September 14, 2023

Renovation of an educational facility in Winnipeg, Manitoba. Completed plans call for the renovation of a educational facility.

*** Awarded contractor is not being released. The reconstruction of the stair treads of the east exterior stairs leading to the 300 level of the University Centre Building at the University of Manitoba Fort Garry Campus in Winnipeg, MB. Demolition work includes the careful demolition of existing concrete stair treads and risers without compromising the structural stair stringers. Construction work includes the construction of new concrete risers glued with no skidding anti slip FRP solution and concrete treads with cast in place Wabocrete nosing for top and bottom stairs. The contract also includes the supply and installation of new steel handrails on both sides of the existing concrete stair sidewalls. Documents are available at https://umanitoba.bonfirehub.ca/ * Only those companies, who are on the list of Pre-qualified General Contractors of University of Manitoba, are eligible to bid this project.

Award

Educational

$65,500.00

Public - State/Provincial

Renovation

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Administrative Requirements, Construction Progress Documentation, Photographic Documentation, Quality Requirements, Regulatory Requirements, References, Definitions, Temporary Facilities and Controls, Construction Facilities, Sanitary Facilities, Temporary Barriers and Enclosures, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Reinforcing Steel, Cast-in-Place Concrete
Division 05 - Metals

Division 05 - Metals

Metal Fabrications, Metal Railings
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Joint Protection, Preformed Joint Seals
Division 09 - Finishes

Division 09 - Finishes

Tiling, Painting and Coating
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts
Division 31 - Earthwork

Division 31 - Earthwork

Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Site Improvements, Fences and Gates, Planting, Plants, Trees

Find More Local Projects

Within 75 Miles of This Project
78
Active Projects
43
Bidding Soon
518
All Active Projects
225
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 31, 2022

June 30, 2022

img_map_placeholder

65 Chancellors Cir, Winnipeg, MB


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.