Published September 29, 2022 at 8:00 PM

Updated October 1, 2024

Renovation of a water / sewer project in Corona, California. Working plans call for the renovation of a water / sewer project.

***As of September 29, 2022. All bids rejected. Online Q&A Yes Q&A Deadline 06/15/2022 5:00 PM (PDT). Scope of Services The Project will consist of the following: o Decommission and demolish existing flow equalization (EQ) ponds No. 1 and No. 2 o Design and construct new EQ basins in the location of EQ pond No. 2. o Decomission and demolish existing screw pump station downstream from the existing EQ ponds. Replace with a Vaughn chopper centrifugal pump configuration. o Design and construct a new coarse bubble aeration system to mix and freshen the wastewater in the new EQ basins. o Design and construct an odor control biofilter system. o Design and construct aluminum covers for odor control over the grit chamber, primary clarifiers, and new EQ basins. o Design and construct all new facilities with safe access for inspection and cleaning. o Design and construct sitework, including concrete, grading, paving, piping, and miscellanerous site improvements, as needed. o Modifications to existing facilities, as needed. o All electrical infrastructure, including conduits, pull boxes, wiring, grounding, enclosures; VFD's and on-site electrical infrastrucutre; surveying; geotechnical engineering; permitting and regulatory approvals including AQMD compliance. o SCADA programming and system integration to be coordinated with City's SCADA programming vendor. o Provide startup, performance testing, and operations training to City staff. SUBMISSION OF PROPOSALS FOR THIS PROJECT IS SUBJECT TO CITY OF CORONA PUBLIC WORKS & UTILITIES DEPARTMENT PREQUALIFIED DESIGN-BUILD ENTITIES ONLY. The City previously conducted a public invitation to prequalify Design-Build (D-B) Entities specific to this Project and will only consider proposals submitted by prequalified Design-Build Entities. The list of prequalified Design-Build Entities approved to submit proposals is available for download using the Documents & Attachments Tab. All pre-approved D-B Entities shall access the Documents & Attachments Tab to review and download all RFP documents. The solicitation documents include, but are not limited to, request for proposals, bridging documents, specifications, general conditions, and required proposal forms. Please allow sufficient time to fully complete and upload all documents prior to the submission deadline. Request for Proposal documents can be uploaded, modified or withdrawn any time prior to the submission deadline. Please review the E-bidding Instructions FAQs uploaded to the Documents & Attachments Tab to familiarize yourself with the PlanetBids system. The PlanetBids system will not accept late proposal packages. No exceptions.

Final Planning

Water / Sewer

$8,500,000.00

Public - City

Renovation

3

30

391

8

Subscribe For Documents

66 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Multiple Contract Summary, Work Sequence, Work Restrictions, Access to Site, Price and Payment Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Construction Progress Documentation, Survey and Layout Data, Submittal Procedures, Certificates, Special Procedures, Alteration Project Procedures, Quality Requirements, Regulatory Requirements, References, Definitions, Reference Standards, Temporary Facilities and Controls, Vehicular Access and Parking, Haul Routes, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Existing Products, Cleaning and Waste Management, Final Cleaning, Starting and Adjusting, Closeout Submittals, Warranties, Spare Parts, Commissioning, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Site Demolition, Selective Structure Demolition
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Accessories, Concrete Reinforcing, Reinforcing Steel, Welded Wire Fabric Reinforcing, Fibrous Reinforcing, Cast-in-Place Concrete, Structural Concrete, Architectural Concrete, Concrete Finishing, Specialty Placed Concrete, Concrete Curing, Precast Concrete, Precast Structural Concrete, Grouting
Division 04 - Masonry

Division 04 - Masonry

Masonry, Common Work Results for Masonry, Masonry Mortaring, Unit Masonry, Concrete Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Metals, Common Work Results for Metals, Metal Fastenings, Structural Metal Framing, Structural Steel Framing, Metal Fabrications, Metal Railings
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Sheathing
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Cementitious and Reactive Waterproofing, Crystalline Waterproofing, Roof and Wall Specialties and Accessories, Roof Accessories, Roof Hatches
Division 08 - Openings

Division 08 - Openings

Hardware, Glazing, Glass Glazing, Louvers and Vents, Vents
Division 09 - Finishes

Division 09 - Finishes

Finishes, Maintenance of Finishes, Painting and Coating, Painting, High-Performance Coatings
Division 10 - Specialties

Division 10 - Specialties

Exterior Specialties, Protective Covers, Other Specialties, Pest Control Devices, Scales
Division 11 - Equipment

Division 11 - Equipment

Entertainment Equipment, Musical Equipment, Bells, Other Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Furniture, Seating, Chairs, Multiple Seating
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Lifts, Scaffolding
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Hangers and Supports for Plumbing Piping and Equipment, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment, Testing, Adjusting, and Balancing for HVAC, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Dampers, Flexible Connectors, HVAC Fans, Air Outlets and Inlets
Division 25 - Integrated Automation

Division 25 - Integrated Automation

Integrated Automation Facility Controls, Integrated Automation Control of HVAC
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Low-Voltage Electrical Power Conductors and Cables, Grounding and Bonding for Electrical Systems, Hangers and Supports for Electrical Systems, Commissioning of Electrical Systems, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Switchboards and Panelboards, Switchboards, Panelboards, Low-Voltage Distribution Equipment, Wiring Devices, Low-Voltage Circuit Protective Devices, Fuses, Facility Electrical Power Generating and Storing Equipment, Power Filters and Conditioners, Capacitors, Lighting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Fine Grading, Excavation and Fill, Subgrade Preparation, Excavation, Trenching, Dewatering, Fill, Backfill, Compaction, Erosion and Sedimentation Controls, Shoring and Underpinning, Concrete Raising, Pressure Grouting, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Operation and Maintenance of Planting, Common Work Results for Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Irrigation, Planting, Plants, Shrubs, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Electrical Utilities, Utility Substations, Communications Utilities, Communications Distribution
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Feeders, Feeders, Batching Equipment, Mixers, Piece Material Handling Equipment, Lifting Devices, Lifts, Manufacturing Equipment, Dies and Molds, Dies, Mobile Plant Equipment, Trucks, Dump Trucks
Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Liquid Handling Equipment
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
253
Active Projects
124
Bidding Soon
2,134
All Active Projects
1,114
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 13, 2022

March 13, 2023

img_map_placeholder

650 E Harrison St, Corona, CA


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Water Reclamation Facility No. 2 Odor Control and Flow Equalization Project

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.