BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in East Allen Township, Pennsylvania. Working plans call for site work for a sidewalk / parking lot; and sidewalk / parking lot.

The project consists of the extension of the storm sewer system on Chaucer Lane and Lord Byron Drive from the end of the existing work. Work includes installation of 2,650+- LF of RCP pipe, storm structures, 3,365+- LF of concrete curb, and 1,870+- SY of mill and overlay, as well as installation of erosion and sediment control facilities and miscellaneous restoration. Final questions are due no later than 4:00 p.m. on Tuesday, May 31, 2022. Each proposal shall be accompanied by a Bid Bond in the required form, certified check, bank cashiers check, or other security acceptable, to the Owner in the amount of 10% of the total Base Bid. Bids will be effective for 60 calendar days from the Bid opening date except as permitted by law, and may not be withdrawn during this period. This Project is subject to the Pennsylvania Prevailing Wage Act. Hanover Township reserves the right at its option to waive any informalities, irregularities, defects, errors or omissions in any or all of Bids and to accept or reject any or all parts of the Bids which in its judgment is in the best interest of Hanover Township.

Final Planning

Water / Sewer

$2,236,600.00

Public - City

Paving, Site Work

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
403
Active Projects
210
Bidding Soon
3,825
All Active Projects
1,823
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 8, 2022

August 11, 2022

img_map_placeholder

Chaucer Ln & Lord Byron Dr, East Allen Township, PA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.