BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 6, 2022 at 8:00 PM

Updated September 14, 2023

Demolition, site work, paving and new construction of a bridge / tunnel in Mifflin Township, Ohio. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

For the labor and material necessary for the improvement of Sunbury Rd 0.02 over Argyle-Woodland Run (MIF-CR8-0.02), in Mifflin Township, Franklin County, Ohio. EBE Goal: 8% Project Description: Improvement of 0.03 miles of Sunbury Rd and rehabilitation of the existing bridge by replacement and widening of the existing concrete slab over a sandstone arch (to remain). The project will provide additional width for roadway and a future sidewalk along Sunbury Road and Woodward Avenue. Work also includes construction of a retaining wall, full depth pavement replacement, curb & gutter, and guardrail. Proposals must contain the name of every person interested therein and shall be accompanied by a bid guaranty and contract bond for the full amount of bid; or in lieu of the bid guaranty and contract bond the bidder may submit a bid guaranty as provided by Section 153.54 of the Revised Code in the form of a certified check or cashiers check. The amount of the certified check or cashier's check shall be equal to ten percent (10%) of the bid. The certified check or cashiers check submitted with a bid will be held as a guarantee on an accepted bid proposal. Bidders are required to be PRE-QUALIFIED WITH THE OHIO DEPARTMENT OF TRANSPORTATION to submit a bid for this project. The contract will be awarded within 60 days of the bid opening date. At that time, a bid guaranty and contract bond in the sum of 100% of the bid plus all add alternates shall be executed in accordance with Section 307.89 of the Revised Code of Ohio. All qualified business enterprises will be afforded full opportunity to submit bids in response to this invitation and no bidder will be discriminated against on the grounds of race, color or national origin in awarding the subject contract. Certified Check or Cashiers Check will be returned to all other bidders after the Contract has been awarded. The bidders address shall be included along with his/her signature on the bid. The work shall be completed no later than October 31, 2022. Upon failure to complete the work within the time specified, the Contractor shall be governed in accordance with Section 5555.67 of the Revised Code of Ohio. No proposal shall be considered unless it complies with all the rules and regulations set forth in the Contract documents. All bidders are urged to carefully read the same and comply with them. The Board of County Commissioners reserves the right to reject any or all bids.

Bid Results

Bridges / Tunnels

$1,356,497.00

Public - County

Demolition, New Construction, Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
223
Active Projects
132
Bidding Soon
2,486
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 24, 2022

July 25, 2022

Project location map

Sunbury Rd, Mifflin Township, OH

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.