BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Pueblo, Colorado. Completed plans call for the renovation of a educational facility.

Pueblo School District 60 is seeking proposals from qualified, reliable vendors to replace certain areas of the roof system at Bradford Elementary School. Please see RFP for full details. Bonding Requirements - Performance Bond 100 % - Payment Bond 100 % Delivery Point Bradford Elementary School Purchase Type One Time Only- Delivery Date:Beginning 2022 Question Acceptance Deadline 05/19/2022 06:00 PM EDT Questions are submitted online No Pueblo School District 60 is seeking competitive proposals for the design, engineering, purchase, delivery, and installation for a partial fully adhered Thermoplastic Polyolefin (TPO) roof system replacement. 1. Contractors will conduct a pre-bid site visit and gather information for the development of a Work Plan. As part of the Work Plan and construction activities the Contractor will identify and comply with all applicable federal, state and local statutes. The Contractor will also comply with applicable terms and conditions of the contract. 2. The finalized Work Plan and interval construction schedule will be submitted to the District's Project Manager for review and approval prior to the start of construction. The Project Manager will provide to the Contractor any existing drawings/specifications relating to the project. 3. All work must be performed during non-school hours and days, with the exception of school breaks. 4. The Contractor will mobilize construction forces necessary to begin the project within ten (10) business days after approval of the Work Plan and construction schedule by the District. 5. The Contractor will arrange for the following as needed: a. A secure staging area for storing equipment, materials, tools, and supplies, as the Contractor shall have sole liability for said items, and b. Access to and provision of utilities as needed for design and construction. 6. The following documents, plans, and reports will be provided to the Project Manager: a. Work Schedule and short interval schedule to include daily and weekly activities b. As-built drawings in electronic PDF form at the end of the project c. Hazardous Waste Disposal Certificates as requested or required, including all hazardous materials abatement/disposal plans needed for the project, and d. Inspection Reports as completed.

Award

Educational

$800,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
25
Active Projects
14
Bidding Soon
211
All Active Projects
88
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 26, 2022

July 25, 2022

img_map_placeholder

107 S La Crosse Ave, Pueblo, CO


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.