Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 12, 2022 at 8:00 PM

Updated September 14, 2023

Site work and new construction of a mixed-use development in Canton, Georgia. Completed plans call for the construction of a educational facility; and for site work for a educational facility.

Construction Project: Aviation Lab at Ace Academy. All questions must be submitted through the Bonfire Message Center. Project Budget: $320,000. Site visits are at Proposer's request. Questions Due Date: Jun 23rd 2022, 2:00 PM EDT Intent to Bid Due Date: Jun 30th 2022, 2:00 PM EDT SCOPE OF SERVICES To provide GC services for the construction (site, building, and systems) of the Owner's Construction of the Project as specified per the Proposal Documents. The requirements for this Project, and the duties and responsibilities of the GC whose Proposal is accepted, are outlined in the Contract Documents which include the Instructions to Proposers; Contract for Construction and Incorporated General Conditions (the "Contract"); supplementary and other conditions; the drawings; the specifications; and any addenda issued by the Architect. The Contract Documents require, among other things, the furnishing of all materials, labor, and equipment for the construction of the Project. The Owner reserves the right to make available other relevant documents or information concerning the Project. A. Dust and Airborne Particulates: Prevent deposition of dust and other particulates in HVAC ducts and equipment. 1. Cleaning of ductwork is not contemplated under this Contract. 2. Contractor shall bear the cost of cleaning required due to failure to protect ducts and equipment from construction dust. 3. Establish condition of existing ducts and equipment prior to start of alterations. B. Airborne Contaminants: Procedures and products have been specified to minimize indoor air pollutants. 1. Furnish products meeting the specifications. 2. Avoid construction practices that could result in contamination of installed products leading to indoor air pollution.

Award

Laboratories

$299,000.00

Public - County

New Construction, Site Work

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
385
Active Projects
176
Bidding Soon
2,369
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 30, 2022

July 18, 2022

Project location map

200 Mountain Brook Ct, Canton, GA

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed