BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 8, 2022 at 8:00 PM

Updated September 14, 2023

Site work, paving and outdoor lighting for a mixed-use development in Everglades City, Florida. Working plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; water / sewer project; and for outdoor lighting for a road / highway.

As per the Owner all bids have been rejected. Editorial Content Team is actively seeking updated information. Counties: Collier Road Name: Copeland Ave and Sr 90 (Us 41) Limits: From Chokoloskee Bay Br to N of Broadway Ave and at Oasis Visitor Center Project(s): 43709615201(*) Federal Aid No: D122028B Project(s): 44197515201 Federal Aid No: D122029B Total Roadway Length: 2.036 Miles Contract Days: 250 Total Bridge Length: 0.000 Miles Total Proposal Length: 2.036 Miles Contract Execution Days: 10 Special Start Date: N/A Aquis/Flexible Start Time: 60 Days (Aqui Time) The improvements under this contract consist of sidewalk construction, drainage improvements, highway signing and other incidental construction along Copeland Avenue (CR 29) from Chokoloskee Bay Bridge to N of Broadway Ave. SR 90 (US 41) at Oasis Visitor Center consists of widening, guardrail work, milling and resurfacing, striping, highway signing and other incidental construction in Collier County For bids over $150,000.00, the standard proposal guaranty of 5% of the bid will be required, unless otherwise stipulated in the proposal advertisement. A Proposal Guaranty of not less than five percent (5%) of the total actual bid in the form of either a certified check, cashier's check, trust company treasurer's check, bank draft of any national or state bank, or a Surety Proposal Guaranty made payable to the Florida Department of Transportation must be received for each bid in excess of $150,000.00 A 100% Payment and Performance Bond will be required for all projects. All work is to be done in accordance with the Plans, special Provisions of the State of Florida Department of Transportation. FDOT - Call Order: 005 - Sidewalk/Milling and Resurfacing/Base Work

Final Planning

Roads / Highways

$4,361,899.00

Public - State/Provincial

Outdoor Lighting, Paving, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
198
Active Projects
31
Bidding Soon
1,460
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 15, 2022

August 8, 2022

Project location map

Copeland Ave, Everglades City, FL


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.