Site work and new construction of a water / sewer project in Crown Point, New York. Completed plans call for the construction of a water / sewer project; and for site work for a water / sewer project.

The project will consist of four (4) Prime Contracts: The Mechanical, Electrical, and Plumbing/Process contracts have been bid and awarded previously. All Addenda issued during that bidding process are annotated in Appendix F and G of the Project Manual. The portion being bid under this notice is for the General Construction (GC) Contract ONLY. Work is generally described as follows; General Construction (GC): The contract includes water production and treatment upgrades for the municipal water system, consisting of 2 water treatment plant and a water storage tank. The project includes removal of existing concrete structures, piping, equipment upgrades and miscellaneous site improvements. The Project is located in Crown Point, NY. The Owner requires the project to be substantially completed on or before September 1, 2023. It is the policy of the Owner to encourage disadvantaged business enterprises, including minority and women business participation in this project by contractors, subcontractors and suppliers, and all bidders are expected to cooperate in implementing this policy. Additionally, all Bidders shall comply with the New York State Environmental Facilities Corporation Program Requirements Mandatory Terms and Conditions, Effective November 1, 2021. Bids shall be submitted on the provided forms in accordance with the Instructions to Bidders. Each Bid must be accompanied by a security deposit in the amount of 5% of the Bid and subject to the conditions provided in the Instruction to Bidders. The successful Bidder shall be required to furnish a 100% Performance Bond and a 100% Payment Bond. Contractor's bids are irrevocable for a period of (45) days after submission. The Owner reserves the right to accept or reject any or all bids.

Award

Water / Sewer

$795,000.00

Public - City

New Construction, Site Work

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Summary of Work, Work by Owner, Work Restrictions, Access to Site, Use of Site, Price and Payment Procedures, Allowances, Cash Allowances, Substitution Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Closeout Procedures, Closeout Submittals, Maintenance Data, Bonds, Warranties, Project Record Documents, Spare Parts, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Facility Remediation, Transportation and Disposal of Hazardous Materials
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Precast Concrete, Precast Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Glass Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Fabrications
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Sheathing, Underlayment, Finish Carpentry
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Thermal Protection, Exterior Insulation and Finish Systems, Fire and Smoke Protection, Firestopping, Joint Protection, Preformed Joint Seals, Joint Gaskets
Division 08 - Openings

Division 08 - Openings

Windows, Louvers and Vents
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Gypsum Board, Tiling, Quarry Tiling, Ceilings, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Interior Specialties, Partitions, Other Specialties, Pest Control Devices
Division 11 - Equipment

Division 11 - Equipment

Commercial Equipment, Office Equipment, Entertainment Equipment, Athletic Equipment, Recreational Equipment
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Lifts
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Hangers and Supports for Plumbing Piping and Equipment, Identification for Plumbing Piping and Equipment, Plumbing Insulation, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Piping, Domestic Water Pumps, Facility Sanitary Sewerage, Sanitary Waste and Vent Piping, Plumbing Equipment, Electric Domestic Water Heaters, Fuel-Fired Domestic Water Heaters, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, HVAC Fans, Air Outlets and Inlets, Decentralized HVAC Equipment, Convection Heating and Cooling Units, Air Coils
Division 25 - Integrated Automation

Division 25 - Integrated Automation

Integrated Automation Facility Controls, Integrated Automation Control of HVAC
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Grounding and Bonding for Electrical Systems, Hangers and Supports for Electrical Systems, Raceway and Boxes for Electrical Systems, Identification for Electrical Systems, Low-Voltage Electrical Distribution, Low-Voltage Switchgear, Switchboards and Panelboards, Panelboards, Low-Voltage Circuit Protective Devices, Fuses, Facility Electrical Power Generating and Storing Equipment, Packaged Generator Assemblies, Lighting, Interior Lighting, Exterior Lighting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Trenching, Dewatering, Fill, Backfill, Compaction, Embankments, Erosion and Sedimentation Controls, Earthwork Methods, Soil Treatment, Rodent Control, Excavation Support and Protection, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Operation and Maintenance of Planting, Bases, Ballasts, and Paving, Flexible Paving, Planting
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Public Sanitary Utility Sewerage Piping, Fuel Distribution Utilities, Natural-Gas Distribution
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment, Coastal Construction, Shoreline Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration, Gas and Vapor Process Piping
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Lifting Devices, Lifts, Mobile Plant Equipment, Mobile Earth Moving Equipment, Excavators
Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Liquid Handling Equipment
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
73
Active Projects
47
Bidding Soon
620
All Active Projects
300
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 3, 2022

July 4, 2022

img_map_placeholder

To Be Determined, Crown Point, NY


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Water Source Improvements

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.