Site work for a water / sewer project in Seattle, Washington. Conceptual plans call for site work for a water / sewer project.

Seattle Public Utilities (SPU) is seeking a civil engineering consultant team to support SPU in the Options Analysis phase of a project to improve the condition of the South Fork Tolt River Dam Spillway. The key objectives for this effort are developing options, obtaining accurate planning level options costs, and developing well-documented non-monetary evaluation criteria scores for each option. At the completion of this "options analysis" work phase, SPU may elect to amend the Contract scope of work to include additional project phases including design/permitting and construction support services. There is no guarantee for additional work phases being added, and the decision to do so will be at the sole discretion of SPU. SPU will review the scope of work, consultant expectations, and answer questions from the prospective bidders. Although attendance at this meeting is not mandatory, attendance is highly encouraged. Written questions related to this RFP are encouraged and shall be directed to Sherry Arciniega, Contract Administrator & SPU's designated contact person, at Sherry.Arciniega@Seattle.gov. To facilitate preparation of responses to questions, please submit questions by no later than 3:00 PM Pacific Time on Tuesday, May 24, 2022. All responses to questions will be posted Electronically The City of Seattle is an Equal Opportunity Employer and selection of the Consultant is subject to applicable laws and ordinances regarding equal opportunity employment. The estimated cost for the Options Analysis phase is $450,000. The estimated cost of potential future phases is to be determined but will be related to the construction cost and complexity of the project alternative that SPU implements (the range is expected to be roughly $600,000 to $8,000,000 depending on the project option that is pursued.) The method of Contractor Selection has not been Determined at this time. As of May 27, 2022, the due date and time has been confirmed with the owner.

Conceptual

Water / Sewer

$450,000.00

Public - City

Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
87
Active Projects
48
Bidding Soon
901
All Active Projects
333
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 1, 2027

img_map_placeholder

To Be Determined, Seattle, WA


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.