EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 17, 2022 at 8:00 PM

Updated October 1, 2024

Site work and paving for a mixed-use development in Norridge, Illinois. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

The improvements to be constructed are for Oketo Avenue between Irving Park Road and Montrose Avenue. Water main work is also planned for Cullom Avenue between Oketo Avenue and Harlem Avenue in the Village of Norridge. This improvement consists of the installation of new water main, re-connecting existing water services, placement of hot-mix asphalt patches and surface course, removal and replacement of driveways and sidewalks, sodding of disturbed parkway areas, and all other appurtenant work thereto.No bidding documents will be issued after 4:00 P.M. on May 26th , 2022. Proposals must be submitted on the forms provided. All bid proposals offered must be accompanied by a bid bond in an amount not less than Ten Percent (10%) of the total amount of the bid or a cashier's check or certified check, made payable to the Order of the President and Board of Trustees of the Village of Norridge and in an amount not less than Ten Percent (10%) of the total amount of the bid, as a guarantee that if the bid proposal is accepted, a contract will be entered into and the performance of the contract properly secured. No bid proposal shall be considered unless accompanied by such bid bond or check. A performance bond and a payment bond, each in the amount of One Hundred Percent (100%) of the contract price and with a corporate surety approved by the Village of Norridge, will be required from the successful bidder to guarantee the full performance of the contract. The Village of Norridge reserves the rights to determine the lowest, responsive, responsible bidder, to waive irregularities, and to reject any or all bid proposals. Bid Results:- 1. (TYPE 1) - Cerniglia Co. - $ 1,842,863. 2. (TYPE 2) - Cerniglia Co. - $ 1,268,580

Under Construction

Water / Sewer

$3,111,443.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution
Division 03 - Concrete

Division 03 - Concrete

Precast Concrete
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Stone Assemblies
Division 09 - Finishes

Division 09 - Finishes

Wall Finishes, Stone Facing
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Backfill
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Watering, Bases, Ballasts, and Paving, Curbs and Gutters, Planting, Turf and Grasses, Sodding

Find More Local Projects

Within 75 Miles of This Project
216
Active Projects
143
Bidding Soon
2,394
All Active Projects
1,054
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 1, 2022

August 8, 2022

img_map_placeholder

Multiple Locations, Norridge, IL

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

2022 Water Main Improvements (Oketo / Cullom)

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.