BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 24, 2022 at 8:00 PM

Updated September 14, 2023

Site work and new construction of a mixed-use development in Concord, New Hampshire. Completed plans call for the construction of a service station / car wash facility; for site work for a service station / car wash facility; 32,710-square-foot pre-engineered storage facility; and pre-engineered storage facility.

Description: Construction of a turnpike facility consisting of 14,885 sf maintenance building, 7,215 sf bridge building, 7,850 sf salt building, 2,760 sf spreader hanger, fuel station, and associated sitework and utilities. The Project will include the Discipline(s) of: Site Construction, Concrete, Masonry, Metals, Wood and Plastics, Thermal and Moisture Protection, Doors and Windows, Finishes, Equipment, Furnishings, Special Construction, Mechanical, Electrical. An interim completion date of October 27, 2023 is established for all contract work at the Newington location. If Add Alternate #2, demolition work at the existing Dover facility is accepted, the completion date for Add Alternate #2 is April 19, 2024. A bid bond shall be submitted electronically at the time of bid in the amount listed below, payable to, s "Treasurer, State of New Hampshire," as security for the execution of the contract. All individuals, firms, partnerships or corporations intending to bid, before obtaining plans and specifications, must file with the Department of Transportation on forms prepared for that purpose at least ten (10) days prior to opening of bids, a statement showing their qualifications. No valid bidding proposal will be issued to a prospective bidder who is not qualified. = Companies, corporations or trade names, except sole proprietorships must be registered with the Secretary of E State (Corporate Division, Telephone No. 603/271-3244) in order to do business with the State of New Hampshire. Bidders are advised that final bid award, as approved by Governor and Executive Council, and issuance of a notification to proceed with the work, can occur up to 60 days or more after the bid opening date. Per section 00204.18.2, Low Bidder has 10 days after notice of award to submit signed Contract, Certificate of Insurance, and Disadvantage Business Enterprise forms, if required. Bidders must submit a 5% bid security at Bid and must furnish a 100% payment and performance security prior to execution of contract. The right is reserved to waive any informalities in or to reject any or all proposals. NHDOT - Newington

Bid Results

Service Station / Car Wash

$19,514,425.00

Public - State/Provincial

New Construction, Site Work

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
426
Active Projects
174
Bidding Soon
2,979
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 22, 2022

August 15, 2022

Project location map

Multiple Locations, Concord, NH


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.