Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published August 4, 2022 at 8:00 PM
Updated September 14, 2023
Renovation of a warehouse / distribution facility in Chouteau, Oklahoma. Working plans call for the renovation of a warehouse / distribution facility.
As of Aug 4 the project was cancelled due to cost. Existing floor is to be mechanically scrubbed to remove contaminants. Heavy oil-stained areas will require a chemical treatment and washed to ensure that oil will not compromise epoxy coating. Concrete surface must be free of laitance, glaze, efflorescence, curing compounds, form-release agents, dust, grease, oil, and other contaminants incompatible with resinous flooring. Work will be required to be completed with little interference with normal operations, since this is a live area contractor will need to coordinate with G.R.D.A. a weekend schedule to perform task. Removal and replacing of equipment will be the responsibility of G.R.D.A. Area specified to be cleaned and painted are to be field measured. An area of 5000 square feet in the northwest area of the warehouse will be painted first. Time will need to be allowed to move existing equipment and pallet racking to this area once it has cured before the rest of the warehouse floor can be painted.
Final Planning
Warehouse / Distribution
$200,000.00
Public - State/Provincial
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 15, 2022
February 4, 2023
8142 OK-412B, Chouteau, OK
Related To This Project
Chouteau, OK
Bid Date: Aug 10 2022
Chouteau, OK
Bid Date: Aug 24 2022
Chouteau, OK
Bid Date: Aug 24 2022
Chouteau, OK
Bid Date: Aug 25 2022
Chouteau, OK
Bid Date: Aug 29 2022
Chouteau, OK
Bid Date: Apr 30 2019
Chouteau, OK
Bid Date: Jul 28 2022
Chouteau, OK
Bid Date: Jul 28 2022
Chouteau, OK
Bid Date: Jul 13 2022
Chouteau, OK
Bid Date: Jun 24 2022
Chouteau, OK
Bid Date: Jul 05 2022
Chouteau, OK
Bid Date: May 24 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
